Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines
10 references·16 citing·37 second hop
Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines (2014)Cost and Schedule Risk Analysis of Bridge…Reliability and Validity Assessment (2011)Reliability and Validity Asse…Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach (2004)Identifying and assessing the…Risk Analysis in Project Management (2003)Risk Analysis in Project Mana…An analysis of success factors and benefits of partnering in construction (2000)An analysis of success factor…Risk Assessment in Construction Schedules (1999)Risk Assessment in Constructi…Risk analysis and management in construction (1997)Risk analysis and management …A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…Risk Management and Construction (1993)Risk Management and Construct…Factors considered in tendering decisions by top UK contractors (1993)Factors considered in tenderi…Reliability and Validity Assessment (1979)Reliability and Validity Asse…Study the delays and conflicts for construction projects and their mutual relationship: A review (2022)Study the delays and conflict…Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System (2020)Schedule Delay Risk Analysis …Improving the Performance of Public Sector Infrastructure Projects: Role of Project Governance and Stakeholder Management (2020)Improving the Performance of …Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants (2019)Risk factors influencing the …A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan (2019)A fuzzy synthetic evaluation …Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects (2018)Using a hybrid system dynamic…Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Schedule risk analysis of inf…Risk Level Evaluation on Construction Project Lifecycle Using Fuzzy Comprehensive Evaluation and TOPSIS (2018)Risk Level Evaluation on Cons…Risk assessment influencing factors for Arabian construction projects using analytic hierarchy process (2018)Risk assessment influencing f…Causes of delays in the construction phase of Chinese building projects (2018)Causes of delays in the const…A statistical approach to assess the schedule delays and risks in Indian construction industry (2018)A statistical approach to ass…Modeling the Relationship between Risk and Dispute in Subcontractor Contracts (2017)Modeling the Relationship bet…Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects (2017)Fuzzy Weighted Interpretive S…A review of risk management process in construction projects of developing countries (2017)A review of risk management p…System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects (2016)System Dynamics Approach for …Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective (2016)Improving risk assessment in …Productivity improvement in construction (1988)Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model (2003)Modelling and assessment of critical risks in BOT road projects (2006)A study of ontology-based risk management framework of construction projects through project life cycle (2009)The reflective practitioner: How professionals think in action (1984)The Reflective Practitioner: How Professionals Think in Action (1985)Project risk management in the Queensland engineering construction industry: a survey (2003)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Impact of risk management on project performance: the importance of soft skills (2014)Evaluating Structural Equation Models with Unobservable Variables and Measurement Error (1981)Marketing Research: An Applied Orientation (1994)Factors affecting contractors’ risk attitudes in construction projects: Case study from China (2010)Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling (2011)Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects (2012)Beyond Partnership: Strategies for Innovation and Lean Supply (1994)Beyond Partnership: Strategies for Innovation and Lean Supply (1994)A portfolio approach to supplier relationships (1997)Exploring Critical Success Factors for Partnering in Construction Projects (2004)The extent of team integration within construction projects (2005)The effect of relationship management on project performance in construction (2011)A Competitive-Bidding Strategy (1956)A survey of current cost estimating practices in the UK (2000)Compressing construction durations: lessons learned from Hong Kong building projects (2002)A Review of Scale Development Practices in the Study of Organizations (1995)A Brief Tutorial on the Development of Measures for Use in Survey Questionnaires (1998)A model of destination image formation (1999)Criteria of project success: an exploratory re-examination (1999)Factors Affecting the Success of a Construction Project (2004)Analysing factors affecting delays in Indian construction projects (2011)A review of techniques for risk management in projects (2007)Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects (2010)Flexible contracts to cope with uncertainty in public–private partnerships (2012)Risk management for overseas construction projects (1995)Modelling global risk factors affecting construction cost performance (2003)Risk management framework for construction projects in developing countries (2004)Use of partial least squares (PLS) in strategic management research: a review of four recent studies (1999)A Partial Least Squares Latent Variable Modeling Approach for Measuring Interaction Effects: Results from a Monte Carlo Simulation Study and an Electronic-Mail Emotion/Adoption Study (2003)
this work references cited by second hop

References

  • 1979Reliability and Validity Assessment5,882 cited
  • 2011Reliability and Validity Assessment5,040 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects831 cited
  • 1997Risk analysis and management in construction758 cited
  • 1993Risk Management and Construction656 cited
  • 2000An analysis of success factors and benefits of partnering in construction505 cited
  • 1993Factors considered in tendering decisions by top UK contractors272 cited
  • 2003Risk Analysis in Project Management270 cited
  • 2004Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach242 cited
  • 1999Risk Assessment in Construction Schedules187 cited

Cited by

  • 2016System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects126 cited
  • 2022Study the delays and conflicts for construction projects and their mutual relationship: A review107 cited
  • 2018Schedule risk analysis of infrastructure projects: A hybrid dynamic approach88 cited
  • 2017Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects87 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2018
Risk assessment influencing factors for Arabian construction projects using analytic hierarchy process
86 cited
  • 2017A review of risk management process in construction projects of developing countries85 cited
  • 2020Improving the Performance of Public Sector Infrastructure Projects: Role of Project Governance and Stakeholder Management73 cited
  • 2018Causes of delays in the construction phase of Chinese building projects70 cited
  • 2016Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective63 cited
  • 2020Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System62 cited
  • 2019A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan59 cited
  • 2018A statistical approach to assess the schedule delays and risks in Indian construction industry54 cited
  • 2019Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants52 cited
  • 2018Risk Level Evaluation on Construction Project Lifecycle Using Fuzzy Comprehensive Evaluation and TOPSIS50 cited
  • 2017Modeling the Relationship between Risk and Dispute in Subcontractor Contracts49 cited
  • 2018Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects49 cited