SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Combining contemporary and traditional project management tools to resolve a project scheduling problem
13 references·4 citing·23 second hop
Combining contemporary and traditional project management tools to resolve a project scheduling problem (2010)Combining contemporary and traditional pr…Optimization analysis for design and planning of multi-project programs (1998)Optimization analysis for des…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Precedence diagramming method: Some unusual characteristics and their implications for project managers (1981)Precedence diagramming method…A Simple CPM Time-Cost Tradeoff Algorithm (1971)A Simple CPM Time-Cost Tradeo…Optimum Time Compression in Project Scheduling (1970)Optimum Time Compression in P…Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMResource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions (1964)Resource Allocation in a PERT…A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Sc…Critical-path planning and scheduling (1959)Critical-path planning and sc…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…Impact of work–life balance with the role of organizational support and job burnout on project performance (2021)Impact of work–life balance w…The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations (2015)The Fuzzy Project Scheduling …Modeling project time–cost trade-off in fuzzy random environment (2014)Modeling project time–cost tr…A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure (2014)A genetic algorithm-based opt…Job Burnout (2001)Perceived organizational support: A review of the literature. (2002)Perceived supervisor support: Contributions to perceived organizational support and employee retention. (2002)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Project management with time, cost, and quality considerations (1996)Time, cost and quality trade-off in project management: a case study (1999)A GA-based fuzzy optimal model for construction time–cost trade-off (2001)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Resource-Activity Critical-Path Method for Construction Planning (2003)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A review of methods and algorithms for optimizing construction scheduling (2013)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1959Critical-path planning and scheduling623 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1969Management Guide to PERT/CPM304 cited
  • 1959Critical-Path Planning and Scheduling283 cited
  • 1971A Simple CPM Time-Cost Tradeoff Algorithm223 cited
  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited
  • 1964Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions84 cited
  • 1981Precedence diagramming method: Some unusual characteristics and their implications for project managers81 cited
  • 1998Optimization analysis for design and planning of multi-project programs75 cited
  • 1970Optimum Time Compression in Project Scheduling63 cited

Cited by

  • 2021Impact of work–life balance with the role of organizational support and job burnout on project performance111 cited
  • 2014A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

37 cited
  • 2014Modeling project time–cost trade-off in fuzzy random environment35 cited
  • 2015The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations32 cited