Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization
9 references·16 citing·32 second hop
Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Applying Pareto Ranking and Niche Formati…Project management in construction (2007)Project management in constru…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Using Improved Genetic Algori…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…A Horizon-Varying, Zero-One Approach to Project Scheduling (1974)A Horizon-Varying, Zero-One A…A Simple CPM Time-Cost Tradeoff Algorithm (1971)A Simple CPM Time-Cost Tradeo…A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Integrating Quality and Safet…A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)A robust time-cost-quality-en…Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)Time-Cost Trade-off Optimizat…Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Discrete particle swarm optim…Automation in construction scheduling: a review of the literature (2015)Automation in construction sc…AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM (2015)AN INTEGRATED MULTI-OBJECTIVE…A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A fuzzy clustering-based gene…AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION (2012)AN ANT COLONY SYSTEM BASED DE…Metaheuristics for project and construction management – A state-of-the-art review (2011)Metaheuristics for project an…GA optimization model for repetitive projects with soft logic (2011)GA optimization model for rep…Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems (2010)Multi‐objective particle swar…Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets (2009)Stochastic Time-Cost-Resource…Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization (2009)Nondominated Archiving Multic…Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis (2007)Using Elitist Particle Swarm …Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects (2006)Parallel Genetic Algorithms f…Construction Resource Scheduling with Genetic Algorithms (1996)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A review of methods and algorithms for optimizing construction scheduling (2013)Critical-Path Planning and Scheduling (1959)A Network Flow Computation for Project Cost Curves (1961)Time, cost and quality trade-off in project management: a case study (1999)A GA-based fuzzy optimal model for construction time–cost trade-off (2001)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)Project scheduling: The effects of problem structure on heuristic performance (1976)Hierarchical models for multi-project planning and scheduling (1993)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)Multiobjective Decision Making: Theory and Methodology (1983)Robust solutions of Linear Programming problems contaminated with uncertain data (2000)A robust optimization approach to closed-loop supply chain network design under uncertainty (2010)Fuzzy Detection System for Rumors Through Explainable Adaptive Learning (2021)Robust optimization of risk-aware, resilient and sustainable closed-loop supply chain network design with Lagrange relaxation and fix-and-optimize (2021)Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia (2022)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Resource-Activity Critical-Path Method for Construction Planning (2003)Selecting a suitable procurement method for a building project (1998)Delay Mitigation in the Malaysian Construction Industry (2006)Future criteria for success of building projects in Malaysia (2010)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 2007Project management in construction364 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 1971A Simple CPM Time-Cost Tradeoff Algorithm223 cited
  • 1997Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization209 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited
  • 1974A Horizon-Varying, Zero-One Approach to Project Scheduling144 cited

Cited by

  • 2020A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project141 cited
  • 2013A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project133 cited
  • 2011Metaheuristics for project and construction management – A state-of-the-art review124 cited
  • 2016Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem122 cited
  • 2007Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

121 cited
  • 2018Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization119 cited
  • 2009Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization118 cited
  • 2009Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets112 cited
  • 2015Automation in construction scheduling: a review of the literature109 cited
  • 2010Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems86 cited
  • 2006Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects83 cited
  • 2012AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION78 cited
  • 2011GA optimization model for repetitive projects with soft logic76 cited
  • 2020Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model75 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2015AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM71 cited