SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Nonlinear Models for Predicting Hoisting Times of Tower Cranes
7 references·2 citing·35 second hop
Nonlinear Models for Predicting Hoisting Times of Tower Cranes (2002)Nonlinear Models for Predicting Hoisting …Neural Network Method of Estimating Construction Technology Acceptability (1995)Neural Network Method of Esti…Forecasting technique familiarity, satisfaction, usage, and application (1995)Forecasting technique familia…Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Estimating Construction Produ…Factors Affecting Masonry‐Labor Productivity (1991)Factors Affecting Masonry‐Lab…A systematic approach to the selection of an appropriate crane for a construction site (1985)A systematic approach to the …A model for the selection of the optimum crane for construction sites (1984)A model for the selection of …Single Crane Location Optimization (1983)Single Crane Location Optimiz…Survey of quantitative methods in construction (2017)Survey of quantitative method…Crane overlap and operational flexibility: balancing utilization, duration, and safety (2017)Crane overlap and operational…The analytic hierarchy process : planning, priority setting, resource allocation (1980)Evaluation of Advanced Construction Technology with AHP Method (1992)Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes (2001)Estimating Project S-Curves Using Polynomial Function and Neural Networks (2009)Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models (2020)Factor Model of Construction Productivity (1987)Estimating weather impact on the duration of construction activities (1997)Conceptual framework of construction productivity estimation (2006)Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study (2016)Bond rating: a nonconservative application of neural networks (1988)Productivity improvement in construction (1988)Planning and analysis of construction operations (1992)A fuzzy neural network approach for contractor prequalification (2001)Construction equipment productivity estimation using artificial neural network model (2006)Estimation of earthworks execution time cost by means of artificial neural networks (2010)Optimum Locations of Switching Centers and the Absolute Centers and Medians of a Graph (1964)State of the Art—Location on Networks: A Survey. Part I: The p-Center and p-Median Problems (1983)State of the Art—Location on Networks: A Survey. Part II: Exploiting Tree Network Structure (1983)Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference (2018)Spatio-temporal planning for tower cranes in construction projects with simulated annealing (2019)Familiarity, application, and performance of sales forecasting techniques (1984)Sales forecasting practices (1987)Experimental comparison of Web, electronic and mail survey technologies in operations management (2001)An exploratory Investigation of new product forecasting practices (2002)Conducting a sales forecasting audit (2003)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Facility location models for distribution system design (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Covering polygons with discs: The problem of crane selection and location on construction sites (2019)Verification and validation of simulation models (1995)Location Optimization for a Group of Tower Cranes (1999)Verification and validation of simulation models (2012)Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method (2004)“Soft” Considerations in Equipment Selection for Building Construction Projects (2007)A system boundary-based critical review on crane selection in building construction (2020)
this work references cited by second hop

References

  • 1995Forecasting technique familiarity, satisfaction, usage, and application139 cited
  • 1994Estimating Construction Productivity: Neural‐Network‐Based Approach123 cited
  • 1991Factors Affecting Masonry‐Labor Productivity92 cited
  • 1985A systematic approach to the selection of an appropriate crane for a construction site67 cited
  • 1995Neural Network Method of Estimating Construction Technology Acceptability59 cited
  • 1983Single Crane Location Optimization57 cited
  • 1984A model for the selection of the optimum crane for construction sites52 cited

Cited by

  • 2017Crane overlap and operational flexibility: balancing utilization, duration, and safety38 cited
  • 2017Survey of quantitative methods in construction34 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work