SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Automated Statistical Analysis in Stochastic Project Scheduling Simulation
16 references·6 citing·27 second hop
Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Automated Statistical Analysis in Stochas…Simplified CPM/PERT Simulation Model (2000)Simplified CPM/PERT Simulatio…Simulation modeling and analysis (1999)Simulation modeling and analy…Simphony (1999)SimphonyGeneral-Purpose Systems for Effective Construction Simulation (1999)General-Purpose Systems for E…Activity-Based Construction (ABC) Modeling and Simulation Method (1999)Activity-Based Construction (…Professional construction management : including C.M., design-construct, and general contracting (1992)Professional construction man…Planning and analysis of construction operations (1992)Planning and analysis of cons…Simulation Model to Forecast Project Completion Time (1985)Simulation Model to Forecast …Project Management: Techniques in Planning and Controlling Construction Projects (1984)Project Management: Technique…Simulation Modeling and Analysis. (1983)Simulation Modeling and Analy…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Probability Concepts in Engineering Planning and Design (1975)Probability Concepts in Engin…CPM in construction management (1971)CPM in construction managementAn Analytical Study of the PERT Assumptions (1964)An Analytical Study of the PE…MONTE CARLO METHODS AND THE PERT PROBLEM (1963)MONTE CARLO METHODS AND THE P…Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Letter to the Editor—Monte Ca…Modeling dynamic construction work template from existing scheduling records via sequential machine learning (2020)Modeling dynamic construction…Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)Data-Driven Machine Learning …Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques (2016)Project Duration Forecasting …An Advanced Stochastic Time‐Cost Tradeoff Analysis Based on a CPM‐Guided Genetic Algorithm (2015)An Advanced Stochastic Time‐C…Probabilistic Estimation and Allocation of Project Time Contingency (2010)Probabilistic Estimation and …Integrated Simulation System for Construction Operation and Project Scheduling (2010)Integrated Simulation System …Introduction to simulation and SLAM II (1979)Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Research in Modeling and Simulation for Improving Construction Engineering Operations (2011)Theory of Modeling and Simulation (2018)Application of a Technique for Research and Development Program Evaluation (1959)Bounding the Project Completion Time Distribution in PERT Networks (1985)Sample-path optimization of convex stochastic performance functions (1996)Critical-Path Planning and Scheduling (1959)Markov and Markov-Regenerative pert Networks (1986)Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Resource-Activity Critical-Path Method for Construction Planning (2003)Simplified Discrete-Event Simulation Approach for Construction Simulation (2003)Structural Reliability Methods (1996)Error and uncertainty in modeling and simulation (2002)Measuring vulnerability to natural hazards: towards disaster resilient societies (2007)Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects (2005)Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Distribution of the Time Through a Directed, Acyclic Network (1965)The use of fuzzy variables in pert (1981)Testing ecological models: the meaning of validation (1996)Developing Theory Through Simulation Methods (2007)Verification and validation of simulation models (2012)Modeling Good Research Practices—Overview: A Report of the ISPOR-SMDM Modeling Good Research Practices Task Force-1 (2012)Simulation Modeling and Analysis (2016)
this work references cited by second hop

References

  • 1983Simulation Modeling and Analysis.8,697 cited
  • 1999Simulation modeling and analysis3,833 cited
  • 1975Probability Concepts in Engineering Planning and Design2,575 cited
  • 1992Planning and analysis of construction operations451 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1964An Analytical Study of the PERT Assumptions283 cited
  • 1963Letter to the Editor—Monte Carlo Methods and the PERT Problem268 cited
  • 1963MONTE CARLO METHODS AND THE PERT PROBLEM240 cited
  • 1999General-Purpose Systems for Effective Construction Simulation237 cited
  • 1984Project Management: Techniques in Planning and Controlling Construction Projects232 cited
  • 1999Simphony191 cited
  • 1971CPM in construction management126 cited
  • 1999Activity-Based Construction (ABC) Modeling and Simulation Method109 cited
  • 1992Professional construction management : including C.M., design-construct, and general contracting107 cited
  • 1985Simulation Model to Forecast Project Completion Time104 cited
  • 2000Simplified CPM/PERT Simulation Model

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

103 cited

Cited by

  • 2010Probabilistic Estimation and Allocation of Project Time Contingency71 cited
  • 2020Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling63 cited
  • 2016Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques63 cited
  • 2015An Advanced Stochastic Time‐Cost Tradeoff Analysis Based on a CPM‐Guided Genetic Algorithm57 cited
  • 2010Integrated Simulation System for Construction Operation and Project Scheduling50 cited
  • 2020Modeling dynamic construction work template from existing scheduling records via sequential machine learning36 cited