SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects
16 references·6 citing·46 second hop
Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects (2013)Analysis of Disruptions Caused by Constru…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…Research in Modeling and Simulation for Improving Construction Engineering Operations (2011)Research in Modeling and Simu…Rework in Civil Infrastructure Projects: Determination of Cost Predictors (2010)Rework in Civil Infrastructur…Construction Project Scheduling and Control (2010)Construction Project Scheduli…Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Methodology for Conducting Di…To Pull or Not to Pull: What Is the Question? (2004)To Pull or Not to Pull: What …Developing a standard methodology for measuring and classifying construction field rework (2004)Developing a standard methodo…Using systems dynamics to better understand change and rework in construction project management systems (2002)Using systems dynamics to bet…Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Influence of Project Type and…An exploration towards a production theory and its application to construction (2000)An exploration towards a prod…Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Parade Game: Impact of Work F…Simulation with Arena (1998)Simulation with ArenaA framework for applying simulation in construction (1998)A framework for applying simu…STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)STROBOSCOPE: State and Resour…Engineering Construction Risks - A Guide to Project Risk Analysis and Risk Management (1992)Engineering Construction Risk…A Proof for the Queuing Formula: L = λ W (1961)A Proof for the Queuing Formu…Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm (2021)Predicting the construction l…Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption (2021)Predicting delays in prefabri…An Empirical Study of Major Factors Affecting Productivity of Construction Projects (2020)An Empirical Study of Major F…Exploring the underlying factors inducing design changes during building production (2018)Exploring the underlying fact…Case-based insights into rework costs of residential building projects in China (2018)Case-based insights into rewo…Evaluation of queuing systems for knowledge-based simulation of construction processes (2014)Evaluation of queuing systems…Productivity improvement in construction (1988)General-Purpose Systems for Effective Construction Simulation (1999)Role of Simulation in Construction Engineering and Management (2010)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster (2016)Lean Thinking-Banish Waste and Create Wealth in Your Corporation. (1997)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Shielding Production: Essential Step in Production Control (1998)Reducing Variability to Improve Performance as a Lean Construction Principle (2002)Work Flow Variation and Labor Productivity: Case Study (2010)A cross-sector review on the use of value stream mapping (2017)The machine that changed the world : the story of lean production (1991)Toyota production system: beyond large-scale production (1998)Inventory Record Inaccuracy: An Empirical Analysis (2008)Lean, take two! Reflections from the second attempt at lean implementation (2008)Lean principles, learning, and knowledge work: Evidence from a software services provider (2010)Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)Risk analysis and management in construction (1997)Quantifying the causes and costs of rework in construction (2000)Supply chain management: a review of implementation risks in the construction industry (2012)Analyzing Causes for Reworks in Construction Projects in China (2014)Causes of delay in residential construction projects in Cambodia (2017)The survey research handbook (1990)Questionnaire Design, Interviewing and Attitude Measurement (1993)A seamless supply chain management model for construction (2004)Taxonomy for change causes and effects in construction projects (2008)Measuring the Impact of Rework on Construction Cost Performance (2009)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Time–cost–quality trade-off analysis for planning construction projects (2019)Out of the Crisis (1982)Case Study Research: Design and Methods (1984)Organizational Learning: A Theory of Action Perspective (1997)Lean project management (2003)The Underlying Theory of Project Management Is Obsolete (2008)Simulation Modeling and Analysis. (1983)Discrete-Event System Simulation (1984)Theory of Modeling and Simulation (2018)Simulation modeling for analysis (2010)Simulation for manufacturing system design and operation: Literature review and analysis (2014)Simulation: The Practice of Model Development and Use (2014)An Equilibrium Queuing Model of Bribery (1985)How to improve R&D productivity: the pharmaceutical industry's grand challenge (2010)
this work references cited by second hop

References

  • 1961A Proof for the Queuing Formula: L = λ W2,777 cited
  • 1998Simulation with Arena1,503 cited
  • 2000An exploration towards a production theory and its application to construction1,241 cited
  • 2004To Pull or Not to Pull: What Is the Question?595 cited
  • 2002Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects464 cited
  • 1996STROBOSCOPE: State and Resource Based Simulation of Construction Processes343 cited
  • 1999Parade Game: Impact of Work Flow Variability on Trade Performance317 cited
  • 2002Using systems dynamics to better understand change and rework in construction project management systems317 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2011Research in Modeling and Simulation for Improving Construction Engineering Operations160 cited
  • 2010Rework in Civil Infrastructure Projects: Determination of Cost Predictors155 cited
  • 1998A framework for applying simulation in construction150 cited
  • 1992Engineering Construction Risks - A Guide to Project Risk Analysis and Risk Management141 cited
  • 2009Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management136 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2010Construction Project Scheduling and Control133 cited
  • 2004Developing a standard methodology for measuring and classifying construction field rework117 cited
  • Cited by

    • 2018Exploring the underlying factors inducing design changes during building production52 cited
    • 2020An Empirical Study of Major Factors Affecting Productivity of Construction Projects47 cited
    • 2014Evaluation of queuing systems for knowledge-based simulation of construction processes45 cited
    • 2021Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption38 cited
    • 2021Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm38 cited
    • 2018Case-based insights into rework costs of residential building projects in China37 cited