Impact of soft logic on the probabilistic duration of construction projects
16 references·0 citing·45 second hop
Impact of soft logic on the probabilistic duration of construction projects (2005)Impact of soft logic on the probabilistic…Resource-Activity Critical-Path Method for Construction Planning (2003)Resource-Activity Critical-Pa…Constraint-Based Planning with Integrated Production Scheduler over Internet (2003)Constraint-Based Planning wit…Resource-constrained project management using enhanced theory of constraint (2002)Resource-constrained project …Project management applications of the theory of constraints beyond critical chain scheduling (2002)Project management applicatio…Model for Evaluating Networks under Correlated Uncertainty—NETCOR (2000)Model for Evaluating Networks…STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)STROBOSCOPE: State and Resour…GERT : Graphical Evaluation and Review Technique, Part I. Fundamental (1996)GERT : Graphical Evaluation a…Soft Logic in Network Analysis (1988)Soft Logic in Network AnalysisSimulation Model to Forecast Project Completion Time (1985)Simulation Model to Forecast …Stochastic Network Model for Planning Scheduling (1983)Stochastic Network Model for …Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Simulation of Construction Project Duration (1979)Simulation of Construction Pr…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…GERT - Graphical Evaluation and Review Technique (1966)GERT - Graphical Evaluation a…An Algebra for the Analysis of Generalized Activity Networks (1964)An Algebra for the Analysis o…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)What is this thing called theory of constraints and how should it be implemented (1990)A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (2005)Why a Critical Path by Any Other Name Would Smell Less Sweet? (2005)A critical chain project scheduling method based on a differential evolution algorithm (2013)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Resource-constrained project scheduling by simulated annealing (1996)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Causes of Delay in the Construction Industry (1971)Project Management: Techniques in Planning and Controlling Construction Projects (1984)Probability of Project Completion Using Stochastic Project Scheduling Simulation (2005)Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (2007)Creating project plans to focus product development. (1992)The handbook of project based management (1993)Project Risk Management: Processes, Techniques and Insights (1998)Strategic Business Management through Multiple Projects (2004)A process framework for theoretically grounded prescriptive research in the project management field (2012)Theory of Constraints: A Literature Review (2014)Planning and analysis of construction operations (1992)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem (2008)A review of methods and algorithms for optimizing construction scheduling (2013)Application of a Technique for Research and Development Program Evaluation (1959)Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of Projects (1967)Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness (2010)Scheduling resource-constrained projects with a flexible project structure (2015)Simulation Modeling and Analysis. (1983)Discrete-Event System Simulation (1984)General-Purpose Systems for Effective Construction Simulation (1999)Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Theory of Modeling and Simulation (2018)Distribution of the Time Through a Directed, Acyclic Network (1965)On the alignment of the purposes and views of process models in project management (2009)Forecasting return of used products for remanufacturing using Graphical Evaluation and Review Technique (GERT) (2016)Planning the reconstruction of a historical building by using a fuzzy stochastic network (2017)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Project scheduling with resource constraints: A branch and bound approach (1987)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1996STROBOSCOPE: State and Resource Based Simulation of Construction Processes343 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 2002Project management applications of the theory of constraints beyond critical chain scheduling175 cited
  • 1966GERT - Graphical Evaluation and Review Technique161 cited
  • 2003Resource-Activity Critical-Path Method for Construction Planning156 cited
  • 1964An Algebra for the Analysis of Generalized Activity Networks111 cited
  • 1985Simulation Model to Forecast Project Completion Time104 cited
  • 2002Resource-constrained project management using enhanced theory of constraint102 cited
  • 1996GERT : Graphical Evaluation and Review Technique, Part I. Fundamental69 cited
  • 1979Simulation of Construction Project Duration59 cited
  • 2000Model for Evaluating Networks under Correlated Uncertainty—NETCOR53 cited
  • 2003Constraint-Based Planning with Integrated Production Scheduler over Internet42 cited
  • 1988

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Soft Logic in Network Analysis
40 cited
  • 1983Stochastic Network Model for Planning Scheduling40 cited