Soft Logic in Network Analysis
3 references·1 citing·16 second hop
Soft Logic in Network Analysis (1988)Soft Logic in Network AnalysisCriticism of CPM for Project Planning Analysis (1984)Criticism of CPM for Project …Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…Impact of soft logic on the probabilistic duration of construction projects (2005)Impact of soft logic on the p…Construction Planning—Beyond the Critical Path (1980)Linear Scheduling Method for Highway Construction (1981)Time Space Scheduling Method (1982)Construction Decision Support System for Delay Analysis (1993)Delay Analysis within Construction Contracting Organizations (2008)Stakeholder Management in International Projects (2010)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry (2015)From project risk to complexity analysis: a systematic classification (2018)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Construction Project Scheduling (1991)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Stochastic Construction Time-Cost Trade-Off Analysis (2000)
this work references cited by second hop

References

  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 1984Criticism of CPM for Project Planning Analysis90 cited

Cited by

  • 2005Impact of soft logic on the probabilistic duration of construction projects38 cited