The payment scheduling problem
2 references·16 citing·43 second hop
The payment scheduling problem (1972)The payment scheduling problemCash Flows in Networks (1970)Cash Flows in NetworksManagement Guide to PERT/CPM (1969)Management Guide to PERT/CPMMaximizing the net present value of a project under uncertainty (2009)Maximizing the net present va…A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (2009)A scatter search heuristic fo…A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (2009)A parameter-tuned genetic alg…Simulated annealing and tabu search for multi-mode project payment scheduling (2008)Simulated annealing and tabu …Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Project Contracts and Payment Schedules: The Client's Problem (2001)Project Contracts and Payment…Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows (2001)Four Payment Models for the M…Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows (1997)Scheduling projects to maximi…On modelling payments in projects (1997)On modelling payments in proj…Activity Delay in Stochastic Project Networks (1997)Activity Delay in Stochastic …The development of cash flow weight procedures for maximizing the net present value of a project (1996)The development of cash flow …Optimization Models for the Scheduling of Testing Tasks in New Product Development (1996)Optimization Models for the S…A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows (1994)A tabu search procedure for t…Scheduling a project to maximize its net present value: An integer programming approach (1993)Scheduling a project to maxim…USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)USING A LATE‐START RESOURCE‐C…Maximizing the net present value of a project subject to materials and capital constraints (1987)Maximizing the net present va…R & D project selection models: An assessment (1974)Recent progress in modeling R&D project-selection processes (1992)Stochastic Programming (1995)Resource-Constrained Scheduling of Tests in New Product Development (1999)A simulation‐optimization framework for research and development pipeline management (2001)Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application (2003)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Project scheduling with resource constraints: A branch and bound approach (1987)A heuristic scheduling algorithm for improving the duration and net present value of a project (1995)Project Management Handbook (1997)An equitable approach to the payment scheduling problem in project management (2000)Project management in construction (2007)Managing Cost Salience and Procrastination in Projects: Compensation and Team Composition (2013)Manufacturing Planning and Control Systems (1984)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Dynamic Version of the Economic Lot Size Model (1958)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Integrated project scheduling and material planning with variable activity duration and rewards (2001)Dynamic Version of the Economic Lot Size Model (2004)Heuristic method for multi‐project finance‐based scheduling (2009)A survey on the resource-constrained project scheduling problem (1995)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows (2014)Professional Construction Management (1976)Scheduling project networks with resource constraints and time windows (1988)Scheduling Projects with Repeating Activities (1998)Automated trade‐off between time and cost in planning repetitive construction projects (2009)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Utility Theory for Decision Making (1971)Optimization of conditional value-at-risk (2000)Stochastic Programming (2010)Investment, financing and the role of ROA and WACC in value creation (2015)Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities (2017)Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration (2017)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Project management with time, cost, and quality considerations (1996)
this work references cited by second hop

References

  • 1969Management Guide to PERT/CPM304 cited
  • 1970Cash Flows in Networks230 cited

Cited by

  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 1996Optimization Models for the Scheduling of Testing Tasks in New Product Development97 cited
  • 2001Project Contracts and Payment Schedules: The Client's Problem88 cited
  • 2001Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows86 cited
  • 1993Scheduling a project to maximize its net present value: An integer programming approach84 cited
  • 2009Maximizing the net present value of a project under uncertainty82 cited
  • 1987Maximizing the net present value of a project subject to materials and capital constraints78 cited
  • 1987USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*74 cited
  • 1997Activity Delay in Stochastic Project Networks66 cited
  • 1997Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows66 cited
  • 1996The development of cash flow weight procedures for maximizing the net present value of a project65 cited
  • 2009A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

62 cited
  • 1997On modelling payments in projects58 cited
  • 2009A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows57 cited
  • 2008Simulated annealing and tabu search for multi-mode project payment scheduling56 cited
  • 1994A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows55 cited