Inequalities for the Completion Times of Stochastic PERT Networks
6 references·9 citing·31 second hop
Inequalities for the Completion Times of Stochastic PERT Networks (1979)Inequalities for the Completion Times of …Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding Distributions for a …On the Expected Duration of PERT Type Networks (1967)On the Expected Duration of P…A Statistical Theory for PERT Critical Path Analysis (1966)A Statistical Theory for PERT…Critical Path Analyses Via Chance Constrained and Stochastic Programming (1964)Critical Path Analyses Via Ch…An Analytical Study of the PERT Assumptions (1964)An Analytical Study of the PE…Expected Critical Path Lengths in PERT Networks (1962)Expected Critical Path Length…A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing (2007)A heuristic for optimizing st…Evaluating project completion times when activity times are Weibull distributed (2003)Evaluating project completion…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Bounds on Expected Project Tardiness (1995)Bounds on Expected Project Ta…Estimating the mean completion time of PERT networks with exponentially distributed durations of activities (1993)Estimating the mean completio…THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE (1989)THE ESTIMATION OF SOME NETWOR…A Multivariate Approach to Estimating the Completion Time for PERT Networks (1986)A Multivariate Approach to Es…An upper bound on the expected completion time of PERT networks (1985)An upper bound on the expecte…The bias of an estimate of coupled slack in stochastic PERT networks (1982)The bias of an estimate of co…Application of a Technique for Research and Development Program Evaluation (1959)Activity networks: Project planning and control by network models (1977)Normally Distributed Activity Durations in PERT Networks (1985)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Ant colony optimization for resource-constrained project scheduling (2002)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Bounding distributions for a stochastic pert network (1977)Management Guide to PERT/CPM (1969)Simulation with GASP-II (1969)Analysis of Activity Networks under Uncertainty (1975)On the sensitivity of project variability to activity mean duration (1999)Finding the critical path in an activity network with time-switch constraints (2000)Markov and Markov-Regenerative pert Networks (1986)The Asymptotic Theory of Extreme Order Statistics (1990)On criticality and sensitivity in activity networks (2000)Sourcing decisions of project tasks with exponential completion times: Impact on operating profits (2011)Making-Sense of the Impact and Importance of Outliers in Project Management through the Use of Power Laws (2013)Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry (2015)Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints (1963)Least Expected Time Paths in Stochastic, Time-Varying Transportation Networks (2000)Contributions of Professor William W. Cooper in Operations Research and Management Science (2008)The use of fuzzy variables in pert (1981)Project scheduling problem with stochastic activity duration times (2004)Stochastic and Fuzzy Pert (1997)Simplified Program Evaluation and Review Technique (PERT) (1999)Bounding the Project Completion Time Distribution in PERT Networks (1985)
this work references cited by second hop

References

  • 1964An Analytical Study of the PERT Assumptions283 cited
  • 1962Expected Critical Path Lengths in PERT Networks188 cited
  • 1971Bounding Distributions for a Stochastic Acyclic Network132 cited
  • 1964Critical Path Analyses Via Chance Constrained and Stochastic Programming117 cited
  • 1967On the Expected Duration of PERT Type Networks100 cited
  • 1966A Statistical Theory for PERT Critical Path Analysis92 cited

Cited by

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1985An upper bound on the expected completion time of PERT networks48 cited
  • 1986A Multivariate Approach to Estimating the Completion Time for PERT Networks45 cited
  • 2003Evaluating project completion times when activity times are Weibull distributed42 cited
  • 1989THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE39 cited
  • 1995Bounds on Expected Project Tardiness34 cited
  • 1982The bias of an estimate of coupled slack in stochastic PERT networks33 cited
  • 1993Estimating the mean completion time of PERT networks with exponentially distributed durations of activities31 cited
  • 2007

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing
28 cited