On the measurement of complexity in activity networks
8 references·11 citing·40 second hop
On the measurement of complexity in activity networks (1980)On the measurement of complexity in activ…Philosophical Problems Concerning the Meaning of Measurement in Physics (1978)Philosophical Problems Concer…Project scheduling: The effects of problem structure on heuristic performance (1976)Project scheduling: The effec…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…Project Network Summary Measures Constrained- Resource Scheduling (1975)Project Network Summary Measu…Theory of Measurement (1971)Theory of MeasurementConditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis (1971)Conditional Monte Carlo: A Si…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)An Algorithm for Optimal Proj…An Account of the Principles of Measurement and Calculation (1928)An Account of the Principles …Going to the core of hard resource-constrained project scheduling instances (2020)Going to the core of hard res…Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem (2020)Automatic detection of the be…A tool to test and validate algorithms for the resource-constrained project scheduling problem (2018)A tool to test and validate a…An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (2013)An automatic algorithm select…A random generator of resource-constrained multi-project network problems (2009)A random generator of resourc…Developing a Complexity Measure for Project Schedules (2006)Developing a Complexity Measu…New computational results for the discrete time/cost trade-off problem with time-switch constraints (2004)New computational results for…Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling (2001)Truncated branch-and-bound, s…Phase Transitions in Project Scheduling (1999)Phase Transitions in Project …A Random Activity Network Generator (1993)A Random Activity Network Gen…THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE (1989)THE ESTIMATION OF SOME NETWOR…Some Properties of Schedules for Large Projects with Limited Resources (1964)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Multi-Project Scheduling: Analysis of Project Performance (1985)A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)The trade-off between stability and makespan in resource-constrained project scheduling (2005)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Solving RCPSP/max by lazy clause generation (2012)Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (2015)An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)Network Analysis in Geography (1970)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)Local search techniques for the generalized resource constrained project scheduling problem (1993)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project Management With Cpm, Pert and Precedence Diagramming (1983)Simulated annealing and tabu search for multi-mode project payment scheduling (2008)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)Distribution of the Time Through a Directed, Acyclic Network (1965)Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding distributions for a stochastic pert network (1977)The use of cutsets in Monte Carlo analysis of stochastic networks (1979)Statistical principles in experimental design. (1962)Resource-constrained project scheduling by simulated annealing (1996)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A review of the fundamental concepts of measurement (1984)Measurement: The theory of numerical assignments. (1986)Measurement Theory, Psychology and the Revolution That Cannot Happen (2009)Truth and consequences of ordinal differences in statistical distributions: Toward a theory of hierarchical inference. (1990)Is the selection of statistical methods governed by level of measurement? (1993)Measurement in Economics (2012)Integrated CO2, cost, and schedule management system for building construction projects using the earned value management theory (2014)Managing a Portfolio of Product Development Projects under Resource Constraints (2015)Quantification of Project Execution Complexity and its Effect on Performance of Infrastructure Development Projects (2017)AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)Project Scheduling Problems: A Survey (1993)A genetic algorithm for resource-constrained scheduling (1996)
this work references cited by second hop

References

  • 1971Theory of Measurement418 cited
  • 1976Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation174 cited
  • 1971An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints165 cited
  • 1971Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis153 cited
  • 1928An Account of the Principles of Measurement and Calculation151 cited
  • 1976Project scheduling: The effects of problem structure on heuristic performance142 cited
  • 1975Project Network Summary Measures Constrained- Resource Scheduling87 cited
  • 1978Philosophical Problems Concerning the Meaning of Measurement in Physics41 cited

Cited by

  • 2004New computational results for the discrete time/cost trade-off problem with time-switch constraints72 cited
  • 2006Developing a Complexity Measure for Project Schedules71 cited
  • 2001Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling70 cited
  • 2013An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem68 cited
  • 1999Phase Transitions in Project Scheduling66 cited
  • 1993A Random Activity Network Generator63 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2009A random generator of resource-constrained multi-project network problems55 cited
  • 2018A tool to test and validate algorithms for the resource-constrained project scheduling problem55 cited
  • 2020Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem54 cited
  • 2020Going to the core of hard resource-constrained project scheduling instances42 cited
  • 1989THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE39 cited