SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Automated trade‐off between time and cost in planning repetitive construction projects
16 references·7 citing·35 second hop
Automated trade‐off between time and cost in planning repetitive construction projects (2009)Automated trade‐off between time and cost…Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Optimal Planning and Scheduli…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimizing Resource Utilizati…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic Construction Time-…Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems (1999)Using Machine Learning and GA…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Using Improved Genetic Algori…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…Construction Planning for Linear Projects (1980)Construction Planning for Lin…Time-cost optimization in repetitive project scheduling with limited resources (2021)Time-cost optimization in rep…Multiobjective Optimization Model for Planning Repetitive Construction Projects (2021)Multiobjective Optimization M…MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM (2019)MULTI-OBJECTIVE SYMBIOTIC ORG…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Minimizing duration and crew work interruptions of repetitive construction projects (2018)Minimizing duration and crew …Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration (2016)Mixed-Integer Linear Programm…Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Decision analysis and behavioral research (1986)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Optimizing linear project scheduling with multi-skilled crews (2012)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Project scheduling with resource constraints: A branch and bound approach (1987)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Optimizing Resource Leveling in Construction Projects (2009)HYBRID NEURAL INTELLIGENT SYSTEM TO PREDICT BUSINESS FAILURE IN SMALL-TO-MEDIUM-SIZE ENTERPRISES (2011)DETECTION OF DRIVING FATIGUE BY USING NONCONTACT EMG AND ECG SIGNALS MEASUREMENT SYSTEM (2013)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Project management in construction (2007)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)RPM: Repetitive Project Modeling (1990)Resource-Activity Critical-Path Method for Construction Planning (2003)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Construction Resource Scheduling with Genetic Algorithms (1996)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)Fuzzy sets (1965)Fuzzy sets (1996)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)A review of methods and algorithms for optimizing construction scheduling (2013)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1998Scheduling Projects with Repeating Activities309 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 1997Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization209 cited
  • 2005Optimal Planning and Scheduling for Repetitive Construction Projects166 cited
  • 2001Optimizing Resource Utilization for Repetitive Construction Projects161 cited
  • 2000Stochastic Construction Time-Cost Trade-Off Analysis158 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park150 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1999Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems112 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

112 cited
  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • Cited by

    • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
    • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
    • 2018Minimizing duration and crew work interruptions of repetitive construction projects40 cited
    • 2019MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM37 cited
    • 2016Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration36 cited
    • 2021Time-cost optimization in repetitive project scheduling with limited resources32 cited
    • 2021Multiobjective Optimization Model for Planning Repetitive Construction Projects32 cited