SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Monte Carlo Simulation Approach to Support Alliance Team Selection
9 references·0 citing·45 second hop
Monte Carlo Simulation Approach to Support Alliance Team Selection (2009)Monte Carlo Simulation Approach to Suppor…Modeling Cost Escalation in Large Infrastructure Projects (2006)Modeling Cost Escalation in L…Comparing Procurement Methods for Design-Build Projects (2006)Comparing Procurement Methods…Alternative Project Delivery, Procurement, and Contracting Methods for Highways (2006)Alternative Project Delivery,…Monte Carlo simulation for schedule risks (2004)Monte Carlo simulation for sc…Targeting optimum value in public sector projects through “best value”‐focused contractor selection (2003)Targeting optimum value in pu…Engineering the Procurement Phase to Achieve Best Value (2003)Engineering the Procurement P…Contractor Selection for Design/Build Projects (2000)Contractor Selection for Desi…Framework for Evaluating Bids of Construction Contractors (1999)Framework for Evaluating Bids…Comparison of U.S. Project Delivery Systems (1998)Comparison of U.S. Project De…Criteria for contractor selection (1997)Project Characteristics for Successful Public-Sector Design-Build (1997)Model for Public Sector Design-Build Project Selection (1998)Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) (2007)Trust and Project Success: A Twofold Perspective between Owners and Contractors (2016)Project procurement management: A structured literature review (2017)Professional Construction Management (1976)QUALIFIER‐1: Contractor Prequalification Model (1990)Qualifier‐2: Knowledge‐Based System for Contractor Prequalification (1990)An AHP model for construction contractor prequalification (2006)Best Value or Lowest Bid? A Quantitative Perspective (2011)A linguistic group decision-making framework for bid evaluation in mega public projects considering carbon dioxide emissions reduction (2017)Using the Analytic Hierarchy Process to Structure the Supplier Selection Procedure (1992)Outranking methods in support of supplier selection (1998)Final contractor selection using the analytical hierarchy process (2000)Quantitative Methods for Design-Build Team Selection (2010)Criteria in consultant selection: public procurement of architectural and engineering services (2011)An overview of construction procurement methods in Australia (2017)Selecting Design-Build: Public and Private Sector Owner Attitudes (1996)Public-Sector Design/Build Evolution and Performance (1999)Design-Builder Selection for Small Highway Projects (2001)Exploration of Team Integration in Spanish Multifamily Residential Building Construction (2016)Implementing Best-Value Procurement for Design–Bid–Build Highway Projects (2016)Scoring Rules and Competitive Behavior in Best-Value Construction Auctions (2016)Forecasting: Methods and Applications. (1979)Forecasting methods and applications (1993)How common and how large are cost overruns in transport infrastructure projects? (2003)Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts (2010)Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model (2011)Neural network-based interval forecasting of construction material prices (2021)Research Methods in Social Sciences. (1977)Mail and internet surveys : the tailored design method (2007)Overcoming resistance to change in engineering and construction: Change management factors for owner organizations (2015)Impact of Team Integration and Group Cohesion on Project Delivery Performance (2016)Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality (2017)Causes of High Costs of Construction in Nigeria (1988)Construction delays in a fast-growing economy: Comparing Thailand with other economies (1996)Simulation Methods (2007)From project risk to complexity analysis: a systematic classification (2018)Schedule Risk Analysis using a Proposed Modified Variance and Mean of the Original Program Evaluation and Review Technique Model (2019)Optimal design of scoring auctions with multidimensional quality (2015)A fuzzy-based decision support system for ranking the delivery methods of mega projects (2018)An exploration towards a production theory and its application to construction (2000)The four roles of supply chain management in construction (2000)Exploring Critical Success Factors for Partnering in Construction Projects (2004)
this work references cited by second hop

References

  • 1998Comparison of U.S. Project Delivery Systems484 cited
  • 2006Comparing Procurement Methods for Design-Build Projects198 cited
  • 2000Contractor Selection for Design/Build Projects149 cited
  • 2006Modeling Cost Escalation in Large Infrastructure Projects114 cited
  • 1999Framework for Evaluating Bids of Construction Contractors63 cited
  • 2003Targeting optimum value in public sector projects through “best value”‐focused contractor selection60 cited
  • 2004Monte Carlo simulation for schedule risks41 cited
  • 2003Engineering the Procurement Phase to Achieve Best Value40 cited
  • 2006Alternative Project Delivery, Procurement, and Contracting Methods for Highways30 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work