Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
3 references·12 citing·32 second hop
Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules (2006)Expanding Finance-Based Scheduling to Dev…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Simplified Spreadsheet Solutions. II: Overall Schedule Optimization (2001)Simplified Spreadsheet Soluti…Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Finance-based scheduling mult…Finance-based scheduling: optimization of results-based funded multiple projects (2019)Finance-based scheduling: opt…Time-cost tradeoff analysis with minimized project financing cost (2018)Time-cost tradeoff analysis w…Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Network analysis algorithm fo…Fast and Near-Optimum Schedule Optimization for Large-Scale Projects (2013)Fast and Near-Optimum Schedul…Improved Genetic Algorithm for Finance-Based Scheduling (2012)Improved Genetic Algorithm fo…Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area (2012)Analyzing the Impact of Negat…Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Multiobjective evolutionary f…Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio (2010)Multiobjective Evolutionary F…GA-based multi-objective optimization of finance-based construction project scheduling (2010)GA-based multi-objective opti…Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost (2009)Fuzzy multi-objective optimiz…Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities (2009)Finance‐based CPM/LOB schedul…Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER (2016)Construction Resource Scheduling with Genetic Algorithms (1996)MACROS: Multiobjective Automated Construction Resource Optimization System (2006)Multiresource Leveling in Line-of-Balance Scheduling (2013)IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY (2014)Journal of Construction Engineering and Management (1983)Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimized acceleration of repetitive construction projects (2013)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)The discrete time-cost tradeoff problem revisited (1995)Heuristic method for multi‐project finance‐based scheduling (2009)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)Fuzzy sets (1965)Multiple Attribute Decision Making: Methods and Applications (1981)Fuzzy sets (1996)Impacts of uncertain project duration and asymmetric risk sensitivity information in project management (2015)An improved robust buffer allocation method for the project scheduling problem (2016)Critical-path planning and scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model (2023)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints (2008)A NOVEL R/S FRACTAL ANALYSIS AND WAVELET ENTROPY CHARACTERIZATION APPROACH FOR ROBUST FORECASTING BASED ON SELF-SIMILAR TIME SERIES MODELING (2020)Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Management of multiple simultaneous projects: a state-of-the-art review (1995)Harnessing AI for value: examining the impact of AI capabilities and the mediating role of organizational agility on project value proposition (2025)
this work references cited by second hop

References

  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 2001Simplified Spreadsheet Solutions. II: Overall Schedule Optimization61 cited

Cited by

  • 2016Network analysis algorithm for the solution of discrete time-cost trade-off problem52 cited
  • 2010GA-based multi-objective optimization of finance-based construction project scheduling51 cited
  • 2009Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities50 cited
  • 2018Time-cost tradeoff analysis with minimized project financing cost49 cited
  • 2020Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms49 cited
  • 2009Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost41 cited
  • 2011Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio40 cited
  • 2010Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio39 cited
  • 2012Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area38 cited
  • 2012Improved Genetic Algorithm for Finance-Based Scheduling37 cited
  • 2013

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Fast and Near-Optimum Schedule Optimization for Large-Scale Projects
31 cited
  • 2019Finance-based scheduling: optimization of results-based funded multiple projects1 cited