SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
13 references·16 citing·45 second hop
The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty (2004)The impact of component commonality in an…Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times (2002)Performance Analysis and Opti…Inventory-Service Optimization in Configure-to-Order Systems (2002)Inventory-Service Optimizatio…Commonality and postponement in multistage assembly systems (2002)Commonality and postponement …Optimal material control in an assembly system with component commonality (2001)Optimal material control in a…Production: Planning, Control and Integration (1997)Production: Planning, Control…Component commonality effects on inventory costs (1996)Component commonality effects…Vendor Performance and Alternative Manufacturing Environments* (1990)Vendor Performance and Altern…Component Commonality with Service Level Requirements (1988)Component Commonality with Se…Stochastic Leadtimes in Two-Level Assembly Systems (1987)Stochastic Leadtimes in Two-L…The Effect of Commonality on Safety Stock in a Simple Inventory Model (1986)The Effect of Commonality on …Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems (1986)Forecasting Error Evaluation …Component part standardization: An analysis of commonality sources and indices (1986)Component part standardizatio…Aggregate Safety Stock Levels and Component Part Commonality (1982)Aggregate Safety Stock Levels…Approach to Value Stream Mapping for Make-To-Order Manufacturing (2020)Approach to Value Stream Mapp…Planned lead times optimization for multi-level assembly systems under uncertainties (2017)Planned lead times optimizati…Assessing the cost structure of component reuse in a product family for remanufacturing (2016)Assessing the cost structure …The impact of decision timing on the suppliers’ interactions: simultaneous moves versus sequential moves (2015)The impact of decision timing…Planning models for continuous supply of parts in assembly systems (2015)Planning models for continuou…The impact of hybrid push–pull contract in a decentralized assembly system (2014)The impact of hybrid push–pul…Managing uncertainty through supply chain flexibility: reactive vs. proactive approaches (2014)Managing uncertainty through …Component procurement and end product assembly in an uncertain supply and demand environment (2014)Component procurement and end…Supply planning and inventory control under lead time uncertainty: A review (2013)Supply planning and inventory…A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty (2013)A State of the Art on Supply …Dual-channel component replenishment problem in an assemble-to-order system (2012)Dual-channel component replen…The cost of using stationary inventory policies when demand is non-stationary (2010)The cost of using stationary …Commonality in manufacturing resources planning – issues and models: a review (2010)Commonality in manufacturing …Uncertainty Factors in Real Manufacturing Environment (2009)Uncertainty Factors in Real M…Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes (2007)Optimal integrated production…Capacity-driven vs. demand-driven material procurement systems (2006)Capacity-driven vs. demand-dr…Production and inventory management (1983)Mitigating supply chain risk through improved confidence (2004)Perspectives in supply chain risk management (2006)3PL provider selection by AHP and TOPSIS methodology (2018)The boomerang returns? Accounting for the impact of uncertainties on the dynamics of remanufacturing systems (2018)Sources of uncertainty in the closed-loop supply chain of lithium-ion batteries for electric vehicles (2021)Japanese manufacturing techniques (1983)Manufacturing Planning and Control Systems (1984)Forecasting methods and applications (1993)Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model (2003)Investigating factors affecting ERP selection in made‐to‐order SME sector (2008)Rolling horizon planning in supply chains: review, implications and directions for future research (2013)Principles of Operations Research. (1970)Decision Systems for Inventory Management and Production Planning (1979)Commonality in product design: Cost saving, valuation change and cannibalization (2000)The Impact of the Secondary Market on the Supply Chain (2002)Supply Chain Operations: Assemble-to-Order Systems (2003)THE MEASUREMENT AND OPERATING BENEFITS OF COMPONENT PART COMMONALITY (1981)Kanban, MRP, and Shaping the Manufacturing Environment (1987)Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis (2004)Tourism supply chain management: A new research agenda (2009)Production and inventory management in the computer age (1974)Toward meso-level product-market network indices for strategic product selection and (re)design guidelines over the product life-cycle (2010)Stochastic Modeling and the Theory of Queues (1989)Foundations of Inventory Management (2000)Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System (2003)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Order-Based Cost Optimization in Assemble-to-Order Systems (2005)An integrated production and inventory model to dampen upstream demand variability in the supply chain (2006)MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)Improved Heuristics for Multi-Stage Requirements Planning Systems (1982)A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System (1986)Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty (2000)Developing a closed-loop supply chain model with price and quality dependent demand and learning in production in a stochastic environment (2018)Note—Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem (1979)Effective Inventory and Service Management Through Product and Process Redesign (1996)Managing modularity of product architectures: toward an integrated theory (2003)MANAGING PRODUCT VARIETY: AN INTEGRATIVE REVIEW AND RESEARCH DIRECTIONS (2003)A Supply Network Model with Base-Stock Control and Service Requirements (2000)Optimal Control of a High-Volume Assemble-to-Order System (2006)Stochastic Programming (2010)Assemble-to-order systems: A review (2017)Project Control: Literature Review (2006)Measuring the efficacy of inventory with a dynamic input–output model (2009)Production planning and control for remanufacturing: literature review and analysis (2011)
this work references cited by second hop

References

  • 1986The Effect of Commonality on Safety Stock in a Simple Inventory Model289 cited
  • 1988Component Commonality with Service Level Requirements217 cited
  • 1982Aggregate Safety Stock Levels and Component Part Commonality211 cited
  • 1997Production: Planning, Control and Integration211 cited
  • 2002Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times135 cited
  • 1986Component part standardization: An analysis of commonality sources and indices121 cited
  • 1986Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems119 cited
  • 1987Stochastic Leadtimes in Two-Level Assembly Systems119 cited
  • 2002Inventory-Service Optimization in Configure-to-Order Systems100 cited
  • 2001Optimal material control in an assembly system with component commonality99 cited
  • 2002Commonality and postponement in multistage assembly systems96 cited
  • 1996Component commonality effects on inventory costs93 cited
  • 1990Vendor Performance and Alternative Manufacturing Environments*93 cited

Cited by

  • 2014Managing uncertainty through supply chain flexibility: reactive vs. proactive approaches124 cited
  • 2010

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

The cost of using stationary inventory policies when demand is non-stationary
70 cited
  • 2013A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty70 cited
  • 2009Uncertainty Factors in Real Manufacturing Environment68 cited
  • 2007Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes62 cited
  • 2016Assessing the cost structure of component reuse in a product family for remanufacturing45 cited
  • 2017Planned lead times optimization for multi-level assembly systems under uncertainties27 cited
  • 2014The impact of hybrid push–pull contract in a decentralized assembly system24 cited
  • 2020Approach to Value Stream Mapping for Make-To-Order Manufacturing23 cited
  • 2014Component procurement and end product assembly in an uncertain supply and demand environment17 cited
  • 2015Planning models for continuous supply of parts in assembly systems16 cited
  • 2010Commonality in manufacturing resources planning – issues and models: a review14 cited
  • 2006Capacity-driven vs. demand-driven material procurement systems13 cited
  • 2013Supply planning and inventory control under lead time uncertainty: A review12 cited
  • 2015The impact of decision timing on the suppliers’ interactions: simultaneous moves versus sequential moves12 cited
  • 2012Dual-channel component replenishment problem in an assemble-to-order system11 cited