Prediction of hoisting time for tower cranes for public housing construction in Hong Kong
3 references·4 citing·28 second hop
Prediction of hoisting time for tower cranes for public housing construction in Hong Kong (1999)Prediction of hoisting time for tower cra…A study of the factors affecting construction durations in Hong Kong (1995)A study of the factors affect…Forecasting in business and economics (1990)Forecasting in business and e…Single Crane Location Optimization (1983)Single Crane Location Optimiz…Crane overlap and operational flexibility: balancing utilization, duration, and safety (2017)Crane overlap and operational…Tower Crane Cycle Times: Case Study of Remote-Control versus Cab-Control Operation (2014)Tower Crane Cycle Times: Case…Tower crane safety in the construction industry: A Hong Kong study (2010)Tower crane safety in the con…Vision System for Tower Cranes (2008)Vision System for Tower CranesProductivity improvement in construction (1988)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Large construction projects in developing countries: a case study from Vietnam (2004)Time‐cost model for building projects in Nigeria (2006)Introduction to work study (1992)Location Optimization for a Group of Tower Cranes (1999)Optimum Locations of Switching Centers and the Absolute Centers and Medians of a Graph (1964)State of the Art—Location on Networks: A Survey. Part I: The p-Center and p-Median Problems (1983)State of the Art—Location on Networks: A Survey. Part II: Exploiting Tree Network Structure (1983)Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes (2001)Modeling Tower Crane Operator Visibility to Minimize the Risk of Limited Situational Awareness (2012)Spatio-temporal planning for tower cranes in construction projects with simulated annealing (2019)Identifying Root Causes of Construction Accidents (2000)Identifying Root Causes of Construction Accidents (2001)Safety Climate in Construction Site Environments (2002)Occupational risk assessment in construction industry – Overview and reflection (2011)Using game technologies to improve the safety of construction plant operations (2011)Fatal accident patterns of building construction activities in China (2018)Motion and Time Study (1976)Integrating real time positioning systems to improve blind lifting and loading crane operations (2013)Identification of Critical Causes of Tower-Crane Accidents through System Thinking and Case Analysis (2020)Verification and validation of simulation models (1995)Verification and validation of simulation models (2012)A systematic review of scholarly works addressing crane safety requirements (2020)Discretized Cell Modeling for Optimal Layout of Multiple Tower Cranes (2023)Long-term forecasting and evaluation (2007)Catch-up strategies in the Indian auto components industry: Domestic firms’ responses to market liberalization (2012)Modelling Economic Growth, Carbon Emissions, and Fossil Fuel Consumption in China: Cointegration and Multivariate Causality (2019)
this work references cited by second hop

References

  • 1995A study of the factors affecting construction durations in Hong Kong134 cited
  • 1983Single Crane Location Optimization57 cited
  • 1990Forecasting in business and economics51 cited

Cited by

  • 2010Tower crane safety in the construction industry: A Hong Kong study175 cited
  • 2008Vision System for Tower Cranes78 cited
  • 2017Crane overlap and operational flexibility: balancing utilization, duration, and safety38 cited
  • 2014Tower Crane Cycle Times: Case Study of Remote-Control versus Cab-Control Operation27 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work