The LP/IP hybrid method for construction time-cost trade-off analysis
6 references·16 citing·35 second hop
The LP/IP hybrid method for construction time-cost trade-off analysis (1996)The LP/IP hybrid method for construction …Schedule compression using the direct stiffness method (1993)Schedule compression using th…A Dynamic Programming Solution to Cost-Time Tradeoff for CPM (1975)A Dynamic Programming Solutio…A Horizon-Varying, Zero-One Approach to Project Scheduling (1974)A Horizon-Varying, Zero-One A…A Simple CPM Time-Cost Tradeoff Algorithm (1971)A Simple CPM Time-Cost Tradeo…A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms (2023)Multi-objective time–cost tra…Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects (2019)A qualitative framework for s…Time-cost tradeoff analysis with minimized project financing cost (2018)Time-cost tradeoff analysis w…Coordinating supplier selection and project scheduling in resource-constrained construction supply chains (2018)Coordinating supplier selecti…Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Time–Cost Optimization Model …AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM (2015)AN INTEGRATED MULTI-OBJECTIVE…Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects (2014)Two-Phase Differential Evolut…Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling (2014)Project Scheduling by Integra…Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects (2012)Group Decision Making for Sto…Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach (2010)Time-Cost Tradeoff Analysis i…Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems (2010)Multi‐objective particle swar…Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation (2009)Ant colony optimization algor…Application of the Fuzzy Weighted Average in Strategic Portfolio Management* (2005)Application of the Fuzzy Weig…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems (1999)Using Machine Learning and GA…A Network Flow Computation for Project Cost Curves (1961)Project management with CPM and PERT (1965)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A review of methods and algorithms for optimizing construction scheduling (2013)Critical-Path Planning and Scheduling (1959)Time, cost and quality trade-off in project management: a case study (1999)A GA-based fuzzy optimal model for construction time–cost trade-off (2001)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)Microeconomic Theory: A Mathematical Approach (1959)Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Fuzzy-based MOGA approach to stochastic time–cost trade-off problem (2009)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)Project scheduling: The effects of problem structure on heuristic performance (1976)Hierarchical models for multi-project planning and scheduling (1993)The discrete time-cost tradeoff problem revisited (1995)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Heuristic method for multi‐project finance‐based scheduling (2009)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)A two-phase GA model for resource-constrained project scheduling (2008)Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off (2008)AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION (2012)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Development of time–cost trade-off optimization model for construction projects with MOPSO technique (2024)Resource-Activity Critical-Path Method for Construction Planning (2003)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1971A Simple CPM Time-Cost Tradeoff Algorithm223 cited
  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited
  • 1975A Dynamic Programming Solution to Cost-Time Tradeoff for CPM154 cited
  • 1974A Horizon-Varying, Zero-One Approach to Project Scheduling144 cited
  • 1993Schedule compression using the direct stiffness method125 cited

Cited by

  • 1999Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems112 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 2010Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems86 cited
  • 2015AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM71 cited
  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2014Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects68 cited
  • 2005Application of the Fuzzy Weighted Average in Strategic Portfolio Management*58 cited
  • 2014Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

56 cited
  • 2023Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms54 cited
  • 2018Coordinating supplier selection and project scheduling in resource-constrained construction supply chains54 cited
  • 2012Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects52 cited
  • 2019A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects51 cited
  • 2018Time-cost tradeoff analysis with minimized project financing cost49 cited
  • 2015Time–Cost Optimization Model Considering Float-Consumption Impact48 cited
  • 2010Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach44 cited
  • 2009Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation42 cited