No open-access location is known for this record yet.
No open-access location is known for this record yet.
This research focuses on solving the multistage processes pacemaker location problem. The aim is to implement lean continuous flow that can satisfy both a high service-level and low inventory cost. Simultaneously, we consider sophisticated variability, such as multi-products, random setup, random breakdown, yield loss, and batch processes, and other contingencies. The problem can be solved by a combination of multiple attribute decision-making and value stream mapping. A lean-pull production strategy adopts two work-in-process setups, and one supermarket as a buffer to create continuous flow. A practical thin film transistor-liquid crystal display manufacturing case study is utilised to illustrate the proposed method. The simulation results indicate that the inventory cost was reduced by over 57% after implementing a lean-pull production strategy.
Loading…
Stored only when both papers are in the corpus — 46 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.