SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Time‐dependent construction social costs model
5 references·2 citing·26 second hop
Time‐dependent construction social costs model (2005)Time‐dependent construction social costs …Freeway Work Zone Traffic Delay and Cost Optimization Model (2003)Freeway Work Zone Traffic Del…Optimum Planning of Highway Construction under A + B Bidding Method (2001)Optimum Planning of Highway C…Optimal Work Zone Lengths for Four-Lane Highways (2001)Optimal Work Zone Lengths for…Lane Rental—Innovative Way to Reduce Road Construction Time (1998)Lane Rental—Innovative Way to…Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Time Is Money: Innovative Con…Pricing Strategy for Best Value Tender (2012)Pricing Strategy for Best Val…“Considerate construction”: case studies of current practice (2007)“Considerate construction”: c…Multiparameter Bidding System—Innovation in Contract Administration (1992)Benchmarking contractor selection practices in public-sector construction-a proposed model (2000)Planning and Scheduling Highway Construction (2004)Evaluation of Alternative Contracting Techniques on FDOT Construction Projects (2007)Construction Planning—Beyond the Critical Path (1980)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Parallel Computing Framework for Optimizing Construction Planning in Large-Scale Projects (2005)MACROS: Multiobjective Automated Construction Resource Optimization System (2006)Robust strategic bidding in auction-based markets (2018)Industrial Market Structure and Economic Performance. (1971)Making Hard Decisions, an Introduction to Decision Analysis (1992)Principles of Economics (2017)Case Study Research: Design and Methods (1984)Case Study Research (2004)Qualitative research: Methods in the social sciences (2006)Breaking down the site hoardings: attitudes and approaches to community consultation during construction (2014)Understanding project stakeholders’ perceptions of public participation in China's infrastructure and construction projects (2014)A Comparison of Buyer-Determined and Price-Based Multiattribute Mechanisms (2007)Court Efficiency and Procurement Performance (2017)Causes of schedule delays in construction projects in Algeria (2018)Optimal Long‐Term Infrastructure Maintenance Planning Accounting for Traffic Dynamics (2009)Integration of Sustainability Issues in Strategic Transportation Planning: A Multi‐criteria Model for the Assessment of Transport Infrastructure Plans (2010)Surrogate‐Based Optimization of Expensive‐to‐Evaluate Objective for Optimal Highway Toll Charges in Transportation Network (2013)Intelligent scheduling of public traffic vehicles based on a hybrid genetic algorithm (2008)Scheduling Work Zones for Highway Maintenance Projects (2008)Assessment of non-recurrent traffic congestion caused by freeway work zones and its statistical analysis with unobserved heterogeneity (2011)
this work references cited by second hop

References

  • 1995Time Is Money: Innovative Contracting Methods in Highway Construction159 cited
  • 2003Freeway Work Zone Traffic Delay and Cost Optimization Model158 cited
  • 2001Optimal Work Zone Lengths for Four-Lane Highways84 cited
  • 1998Lane Rental—Innovative Way to Reduce Road Construction Time62 cited
  • 2001Optimum Planning of Highway Construction under A + B Bidding Method51 cited

Cited by

  • 2007“Considerate construction”: case studies of current practice40 cited
  • 2012Pricing Strategy for Best Value Tender31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work