Controlling activity interval times in LOB scheduling
10 references·1 citing·29 second hop
Controlling activity interval times in LOB scheduling (1998)Controlling activity interval times in LO…CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)CPM/LOB: New Methodology to I…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…Planning repetitive construction: Current practice (1993)Planning repetitive construct…Production and Operations Management (1991)Production and Operations Man…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Formal Development of Line‐of‐Balance Technique (1990)Formal Development of Line‐of…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Planning Construction of Repetitive Building Units (1974)Planning Construction of Repe…Resource Leveling Based on Line of Balance and Constraint Programming (2018)Resource Leveling Based on Li…Introduction to simulation and SLAM II (1979)Operations Research -- An Introduction (1980)Using the Line of Balance for Production System Design (2008)Journal of Industrial Engineering (2017)Construction Planning for Linear Projects (1980)Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Modern Construction Management (2012)Linear Scheduling Method for Highway Construction (1981)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Project Management with Dynamic Scheduling (2012)Siren: A Repetitive Construction Simulation Model (1985)Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Work Continuity Constraints in Project Scheduling (2005)Optimizing linear project scheduling with multi-skilled crews (2012)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)A Retrospective Look at Production and Operations Management Articles on New Product Development (2005)Follow the small? Information‐revealing adoption bandwagons when observers expect larger firms to benefit more from adoption (2007)Applying fuzzy AHP–TOPSIS technique in identifying the content strategy of sustainable manufacturing for food production (2018)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Resource-driven scheduling of repetitive activities (1998)Effect of learning on line-of-balance scheduling (2001)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Automated progress monitoring system for linear infrastructure projects using satellite remote sensing (2016)
this work references cited by second hop

References

  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1991Production and Operations Management144 cited
  • 1994CPM/LOB: New Methodology to Integrate CPM and Line of Balance112 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 1974Planning Construction of Repetitive Building Units101 cited
  • 1990Formal Development of Line‐of‐Balance Technique90 cited
  • 1993Planning repetitive construction: Current practice41 cited

Cited by

  • 2018Resource Leveling Based on Line of Balance and Constraint Programming34 cited