SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand
16 references·1 citing·39 second hop
A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand (2011)A network approach to modeling the multi-…REDUCING COSTS OF SPARE PARTS SUPPLY SYSTEMS VIA STATIC PRIORITIES (2009)REDUCING COSTS OF SPARE PARTS…Using repair priorities to reduce stock investment in spare part networks (2004)Using repair priorities to re…Single cycle policies for the one-warehouse N-retailer inventory/distribution system (2004)Single cycle policies for the…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…Multiple-supplier inventory models in supply chain management: A review (2002)Multiple-supplier inventory m…Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems (2002)Effects of finite repair capa…An overview of recent literature on spare parts inventories (2002)An overview of recent literat…Maintenance spare parts logistics: Special characteristics and strategic choices (2001)Maintenance spare parts logis…Economic lot-sizing with remanufacturing options (2001)Economic lot-sizing with rema…Models for multi-echelon repairable item inventory systems with limited repair capacity (1997)Models for multi-echelon repa…Logistics of Production and Inventory (1995)Logistics of Production and I…Logistics of Production and Inventory (1993)Logistics of Production and I…Priority repair and dispatch policies for reparable-item logistics systems (1990)Priority repair and dispatch …Modelling Emergency Lateral Transshipments in Inventory Systems (1990)Modelling Emergency Lateral T…A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (1969)A Backlogging Model and a Mul…Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Econom…Civil Aircraft Spare Parts Prediction and Configuration Management Techniques: Review and Prospect (2021)Civil Aircraft Spare Parts Pr…Supply Chain Management: More Than a New Name for Logistics (1997)Supply Chain Management: Implementation Issues and Research Opportunities (1998)Inventory management and production planning and scheduling (1999)Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice (2011)Additive manufacturing technology in spare parts supply chain: a comparative study (2016)OR in spare parts management: A review (2017)Analysis of Inventory Systems. (1964)Operations Research and Capacity Expansion Problems: A Survey (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Coordination mechanisms of supply chain systems (2006)Metric: A Multi-Echelon Technique for Recoverable Item Control (1968)A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment (1985)A Multi-Echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments (1987)The Impact of the Secondary Market on the Supply Chain (2002)Who Benefits from Transshipment? Exogenous vs. Endogenous Wholesale Prices (2004)Making Better Fulfillment Decisions on the Fly in an Online Retail Environment (2014)The Queueing Network Analyzer (1983)Reverse Logistics: A Review of Case Studies (2005)Maintenance spare parts planning and control: a framework for control and agenda for future research (2014)System-oriented inventory models for spare parts (2014)Coordinated supply chain management (1996)Reducing the Cost of Demand Uncertainty Through Accurate Response to Early Sales (1996)Quantitative Models for Supply Chain Management (1999)An empirically derived agenda of critical research issues for managing supply-chain disruptions (2005)Perspectives in supply chain risk management (2006)Green supply‐chain management: A state‐of‐the‐art literature review (2007)Intermittent demand: Linking forecasting to inventory obsolescence (2011)Joint maintenance and inventory optimization systems: A review (2012)Forecasting: theory and practice (2022)A robust optimization model for stochastic logistic problems (2000)An Inventory-Location Model: Formulation, Solution Algorithm and Computational Results (2002)Operations management research methodologies using quantitative modeling (2002)Perishable Inventory Theory: A Review (1982)Quantitative models for reverse logistics: A review (1997)Production in Networks (2002)A supply chain network equilibrium model with random demands (2003)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Smart “Predict, then Optimize” (2021)
this work references cited by second hop

References

  • 1958Dynamic Version of the Economic Lot Size Model2,068 cited
  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 2002Multiple-supplier inventory models in supply chain management: A review541 cited
  • 1969A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach509 cited
  • 2002An overview of recent literature on spare parts inventories504 cited
  • 1995Logistics of Production and Inventory397 cited
  • 2001Maintenance spare parts logistics: Special characteristics and strategic choices351 cited
  • 1990Modelling Emergency Lateral Transshipments in Inventory Systems270 cited
  • 1993Logistics of Production and Inventory235 cited
  • 1997Models for multi-echelon repairable item inventory systems with limited repair capacity175 cited
  • 2001Economic lot-sizing with remanufacturing options134 cited
  • 2002Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems92 cited
  • 2004Using repair priorities to reduce stock investment in spare part networks71 cited
  • 1990Priority repair and dispatch policies for reparable-item logistics systems53 cited
  • 2009REDUCING COSTS OF SPARE PARTS SUPPLY SYSTEMS VIA STATIC PRIORITIES

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

43 cited
  • 2004Single cycle policies for the one-warehouse N-retailer inventory/distribution system42 cited
  • Cited by

    • 2021Civil Aircraft Spare Parts Prediction and Configuration Management Techniques: Review and Prospect15 cited