Project Scheduling with Discounted Cash Flows and Progress Payments
9 references·2 citing·33 second hop
Project Scheduling with Discounted Cash Flows and Progress Payments (1996)Project Scheduling with Discounted Cash F…Scheduling a project to maximize its net present value: An integer programming approach (1993)Scheduling a project to maxim…Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (1993)Early-tardy cost trade-offs i…The scheduling of activities to maximize the net present value of projects (1990)The scheduling of activities …Project bidding under deterministic and probabilistic activity durations (1990)Project bidding under determi…USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)USING A LATE‐START RESOURCE‐C…A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)A Comparison of Heuristics fo…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…The payment scheduling problem (1972)The payment scheduling problemCash Flows in Networks (1970)Cash Flows in NetworksEnhanced heuristic for finance-based scheduling of construction projects (2015)Enhanced heuristic for financ…An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (1998)An optimal procedure for the …Activity networks: Project planning and control by network models (1977)Optimization Models for the Scheduling of Testing Tasks in New Product Development (1996)Project Contracts and Payment Schedules: The Client's Problem (2001)A review of the contribution of Operational Research to Project Management (2002)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)A comparison of stochastic scheduling rules for maximizing project net present value (1995)An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment (1997)Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds (2001)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Project scheduling with resource constraints: A branch and bound approach (1987)A heuristic scheduling algorithm for improving the duration and net present value of a project (1995)Activity Delay in Stochastic Project Networks (1997)A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (2009)Manufacturing Planning and Control Systems (1984)The development of cash flow weight procedures for maximizing the net present value of a project (1996)Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows (1997)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Application of a Technique for Research and Development Program Evaluation (1959)Simple probability models for project contracting (2004)Coordination and Incentive Contracts in Project Management Under Asymmetric Information (2006)Management Guide to PERT/CPM (1969)Work Continuity Constraints in Project Scheduling (2005)Critical-path planning and scheduling (1959)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Hierarchical models for multi-project planning and scheduling (1993)Analysis of the characteristics of projects in diverse industries (1998)Using metaheuristics in multiobjective resource constrained project scheduling (2000)
this work references cited by second hop

References

  • 1970Cash Flows in Networks230 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach147 cited
  • 1986A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions135 cited
  • 1990The scheduling of activities to maximize the net present value of projects124 cited
  • 1972The payment scheduling problem119 cited
  • 1993Scheduling a project to maximize its net present value: An integer programming approach84 cited
  • 1987USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*74 cited
  • 1993Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach53 cited
  • 1990Project bidding under deterministic and probabilistic activity durations42 cited

Cited by

  • 1998An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations37 cited
  • 2015Enhanced heuristic for finance-based scheduling of construction projects33 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work