A Dynamic Programming Algorithm for Decision CPM Networks
0 references·16 citing·44 second hop
A Dynamic Programming Algorithm for Decision CPM Networks (1979)A Dynamic Programming Algorithm for Decis…Extensions of the resource-constrained project scheduling problem (2023)Extensions of the resource-co…Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)Optimization of environmental…Scheduling Optimization of Linear Schedule with Constraint Programming (2017)Scheduling Optimization of Li…Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms (2016)Fuzzy Resource Constraint Pro…A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (2014)A Multi-Objective Imperialist…Project Management with Dynamic Scheduling (2012)Project Management with Dynam…Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version (2009)Discrete time/cost trade-off …Simulated annealing and tabu search for multi-mode project payment scheduling (2008)Simulated annealing and tabu …A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution (2008)A multi-mode resource-constra…A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search (2007)A solution procedure for the …On the discrete time, cost and quality trade-off problem (2006)On the discrete time, cost an…New computational results for the discrete time/cost trade-off problem with time-switch constraints (2004)New computational results for…Network decomposition-based benchmark results for the discrete time–cost tradeoff problem (2004)Network decomposition-based b…Flexible Model for Time/Cost Tradeoff Problem (2004)Flexible Model for Time/Cost …Discrete time/cost trade-offs in project scheduling with time-switch constraints (2002)Discrete time/cost trade-offs…Resource-Constrained Project Scheduling: Past Work and New Directions 1 (2001)Resource-Constrained Project …A Network Flow Computation for Project Cost Curves (1961)Project Management With Cpm, Pert and Precedence Diagramming (1983)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Smart optimization for mega construction projects using artificial intelligence (2014)Optimizing time, cost and quality in multi-mode resource-constrained project scheduling (2019)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (2010)Robust optimization models for the discrete time/cost trade-off problem (2010)Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling (2020)A Simple CPM Time-Cost Tradeoff Algorithm (1971)The discrete time-cost tradeoff problem revisited (1995)Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks (1997)Performing complex project crashing analysis with aid of particle swarm optimization algorithm (2006)Trade-Off Analysis Approach for Multiobjective Transportation Investment Decision Making (2014)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Project management with time, cost, and quality considerations (1996)Time, cost and quality trade-off in project management: a case study (1999)Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization (2013)Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (2015)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Classification Scheme for Project Scheduling (1999)The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects (2005)Decision Support and Optimization in Shutdown and Turnaround Scheduling (2010)CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off (2015)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects (2014)Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search (2017)Taguchi Techniques for Quality Engineering (1989)Quality Engineering Using Robust Design (1990)Quality Engineering Using Robust Design (1991)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms (2019)Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach (2020)Factors Affecting the Cost of Airplanes (1936)Setting tolerance limits for statistical project control using earned value management (2014)A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (2016)Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking (2018)A Guide to the project management body of knowledge (1996)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2012Project Management with Dynamic Scheduling105 cited
  • 2004Network decomposition-based benchmark results for the discrete time–cost tradeoff problem99 cited
  • 2006On the discrete time, cost and quality trade-off problem97 cited
  • 2008A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution93 cited
  • 2023Extensions of the resource-constrained project scheduling problem83 cited
  • 2007A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search80 cited
  • 2014A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations79 cited
  • 2004New computational results for the discrete time/cost trade-off problem with time-switch constraints72 cited
  • 2002Discrete time/cost trade-offs in project scheduling with time-switch constraints68 cited
  • 2004Flexible Model for Time/Cost Tradeoff Problem67 cited
  • 2020Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach62 cited
  • 2017Scheduling Optimization of Linear Schedule with Constraint Programming61 cited
  • 2009Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

60 cited
  • 2016Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms59 cited
  • 2008Simulated annealing and tabu search for multi-mode project payment scheduling56 cited
  • 2001Resource-Constrained Project Scheduling: Past Work and New Directions 154 cited