SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem
9 references·11 citing·35 second hop
A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)A novel Multiple Objective Symbiotic Orga…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints (2008)Hybrid of genetic algorithm a…Multi-objective Group Decision Making: Methods, Software and Applications With Fuzzy Set Techniques (2007)Multi-objective Group Decisio…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Impact of Extended Overtime on Construction Labor Productivity (2005)Impact of Extended Overtime o…Shift work, safety and productivity (2003)Shift work, safety and produc…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…The impact of shift and night work on health (1996)The impact of shift and night…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Choosing the right collaboration partner for innovation: a framework based on topic analysis and link prediction (2022)Choosing the right collaborat…Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Tradeoff time cost quality in…Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Integrating Quality and Safet…Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling (2020)Discrete symbiotic organisms …Time–cost–quality trade-off analysis for planning construction projects (2019)Time–cost–quality trade-off a…Optimization model for construction project resource leveling using a novel modified symbiotic organisms search (2018)Optimization model for constr…A Symbiotic Organisms Search Algorithm for Optimal Allocation of Blood Products (2018)A Symbiotic Organisms Search …A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration (2018)A robust scheduling for the m…A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns (2018)A grey mathematical model for…Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Utility of Genetic Algorithms…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Catastrophes, Sleep, and Public Policy: Consensus Report (1988)Shift work and occupational medicine: an overview (2003)Eating and shift work – effects on habits, metabolism and performance (2010)Association Between Rotating Night Shift Work and Risk of Coronary Heart Disease Among Women (2016)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Resource-constrained multi-project scheduling problem: A survey (2022)Health disorders of shift workers (2003)Shift work and disturbed sleep/wakefulness (2003)Shift Work and Health: Current Problems and Preventive Actions (2010)The link between fatigue and safety (2010)A guide to the project management body of knowledge (PMBOK guide) (2004)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach (2020)Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project (2022)Time-cost trade-off optimization model for retrofitting planning projects using MOGA (2024)A flexible consensus scheme for multicriteria group decision making under linguistic assessments (2009)Managing Multigranular Unbalanced Hesitant Fuzzy Linguistic Information in Multiattribute Large-Scale Group Decision Making: A Linguistic Distribution-Based Approach (2019)Consensus reaching for social network group decision making by considering leadership and bounded confidence (2020)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)Possible Broad Impacts of Long Work Hours (2006)Beyond workaholism: Towards a general model of heavy work investment (2011)Dynamic modeling of labor productivity in construction projects (2012)
this work references cited by second hop

References

  • 2003Shift work, safety and productivity774 cited
  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1996The impact of shift and night work on health557 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 2007Multi-objective Group Decision Making: Methods, Software and Applications With Fuzzy Set Techniques283 cited
  • 2005Impact of Extended Overtime on Construction Labor Productivity234 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2008Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints171 cited

Cited by

  • 2019Time–cost–quality trade-off analysis for planning construction projects102 cited
  • 2020Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model75 cited
  • 2017Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems74 cited
  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2020
Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
63 cited
  • 2021Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm54 cited
  • 2018A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration49 cited
  • 2018A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns47 cited
  • 2018Optimization model for construction project resource leveling using a novel modified symbiotic organisms search44 cited
  • 2022Choosing the right collaboration partner for innovation: a framework based on topic analysis and link prediction24 cited
  • 2018A Symbiotic Organisms Search Algorithm for Optimal Allocation of Blood Products20 cited