Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation
11 references·1 citing·39 second hop
Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation (2016)Study on the identification of main drive…ADVANCED MMIS TOWARD SUBSTANTIAL REDUCTION IN HUMAN ERRORS IN NPPS (2013)ADVANCED MMIS TOWARD SUBSTANT…Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents (2006)Cognitive modeling and dynami…Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents (2006)Cognitive modeling and dynami…A taxonomy of performance influencing factors for human reliability analysis of emergency tasks (2003)A taxonomy of performance inf…A data-based method for assessing and reducing human error to improve operational performance (2003)A data-based method for asses…Cognitive reliability and error analysis method (1998)Cognitive reliability and err…The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI (1997)The development of a nuclear …INTENT: a method for estimating human error probabilities for decisionbased errors (1992)INTENT: a method for estimati…Handbook of human reliability analysis with emphasis on nuclear power plant applications (1985)Handbook of human reliability…Peer-review study of the draft handbook for human-reliability analysis with emphasis on nuclear-power-plant applications, NUREG/CR-1278 (1983)Peer-review study of the draf…Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report (1983)Handbook of human-reliability…Identifying and clustering performance shaping factors for nuclear power plant commissioning tasks (2020)Identifying and clustering pe…The Influence of Length and Frequency of Training Session on the Rate of Learning to Type (1978)The validation of three human reliability quantification techniques — THERP, HEART and JHEDI: Part 1 — technique descriptions and validation issues (1996)Review of techniques and challenges of human and organizational factors analysis in maritime transportation (2021)Teams: Their Training and Performance (1992)Toward an understanding of team performance and training. (1992)Barrier and operational risk analysis of hydrocarbon releases (BORA-Release)Part I. Method description (2006)A data-informed PIF hierarchy for model-based Human Reliability Analysis (2012)Human Reliability Analysis (2020)Prospect Theory: An Analysis of Decision under Risk (1979)Prospect theory: An analysis of decision under risk (1988)Context and human reliability analysis (1993)A methodology for modeling operator errors of commission in probabilistic risk assessment (1994)Assessment of human reliability based on evaluation of plant experience: requirements and implementation (1999)The Method of Paired Comparisons. (1964)New technology and human error (1988)Human Reliability Analysis: Context and Control (1994)Structured information analysis for human reliability analysis of emergency tasks in nuclear power plants (2001)Human Reliability Assessment (2008)A statistical approach to estimating effects of performance shaping factors on human error probabilities of soft controls (2015)Judgment under Uncertainty: Heuristics and Biases (1975)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents. Part 4: IDAC causal model of operator problem-solving response (2006)Industrial disasters: Extreme events, extremely rare. Some reflections on the treatment of uncertainties in the assessment of the associated risks (2012)Stress: Appraisal and Coping (2013)Two decades on human reliability analysis: A bibliometric analysis and literature review (2020)Availability: A heuristic for judging frequency and probability (1973)Judgment under Uncertainty: Heuristics and Biases (1974)Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization (2008)Bayesian belief networks for human reliability analysis: A review of applications and gaps (2015)A systematic review of human-AI interaction in autonomous ship systems (2022)Development and application of a human error identification tool for air traffic control (2002)Cognitive flexibility and adaptability to environmental changes in dynamic complex problem-solving tasks (2003)A methodology to model causal relationships on offshore safety assessment focusing on human and organizational factors (2008)The Concept of Probability in Safety Assessments of Technological Systems (1990)The paradoxes of almost totally safe transportation systems (2001)How Useful Is Quantitative Risk Assessment? (2004)Cockpit Checklists: Concepts, Design, and Use (1993)Safety barriers: Definition, classification, and performance (2006)Applications of Bayesian networks and Petri nets in safety, reliability, and risk assessments: A review (2019)
this work references cited by second hop

References

  • 1983Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report1,460 cited
  • 1985Handbook of human reliability analysis with emphasis on nuclear power plant applications694 cited
  • 1998Cognitive reliability and error analysis method473 cited
  • 2003A data-based method for assessing and reducing human error to improve operational performance321 cited
  • 1983Peer-review study of the draft handbook for human-reliability analysis with emphasis on nuclear-power-plant applications, NUREG/CR-1278281 cited
  • 2006Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents269 cited
  • 2003A taxonomy of performance influencing factors for human reliability analysis of emergency tasks186 cited
  • 2006Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents87 cited
  • 1992INTENT: a method for estimating human error probabilities for decisionbased errors63 cited
  • 1997The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI57 cited
  • 2013ADVANCED MMIS TOWARD SUBSTANTIAL REDUCTION IN HUMAN ERRORS IN NPPS23 cited

Cited by

  • 2020Identifying and clustering performance shaping factors for nuclear power plant commissioning tasks10 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work