Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers
16 references·0 citing·33 second hop
Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers (2015)Simultaneous planning of the project sche…Introduction to quality engineering.... (2014)Introduction to quality engin…Integrated scheduling and batch ordering for construction project (2013)Integrated scheduling and bat…A bi-objective optimization approach for exclusive bus lane selection and scheduling design (2013)A bi-objective optimization a…Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost (2009)Fuzzy multi-objective optimiz…Resource‐Constrained Project Scheduling (2008)Resource‐Constrained Project …Resource-constrained construction project scheduling model for profit maximization considering cash flow (2008)Resource-constrained construc…Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Experimental investigation of…Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…Integrated project scheduling and material planning with variable activity duration and rewards (2001)Integrated project scheduling…Design and Analysis of Experiments, 5th Ed. (2001)Design and Analysis of Experi…Design and Analysis of Experiments (2000)Design and Analysis of Experi…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …Optimal Project Scheduling with Materials Ordering (1987)Optimal Project Scheduling wi…Constrained resource project scheduling subject to material constraints (1984)Constrained resource project …A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning (1980)A formal set of algorithms fo…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Management Guide to PERT/CPM (1969)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Material Requirements Planning (1978)Maximizing the net present value of a project subject to materials and capital constraints (1987)USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)Principles of accounting (1919)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Ant colony optimization for resource-constrained project scheduling (2002)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Robust and reactive project scheduling: a review and classification of procedures (2004)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Branch-and-price approach for the multi-skill project scheduling problem (2013)Mixed-Integer Linear Programming Formulations (2014)Scheduling Optimization of Linear Schedule with Constraint Programming (2017)Response Surface Methodology: A Retrospective and Literature Survey (2004)Optimizing Drug Delivery Systems Using Systematic "Design of Experiments." Part I: Fundamental Aspects (2005)State-of-the-Art Review: A User’s Guide to the Brave New World of Designing Simulation Experiments (2005)STRATEGIES FOR ROBUST MULTIRESPONSE QUALITY ENGINEERING (1993)A method for constructing supersaturated designs and its Es2 optimality (1997)Decision-making techniques in supplier selection: Recent accomplishments and what lies ahead (2019)Design and Analysis of Experiments (2001)Design and Analysis of Experiments (2006)
this work references cited by second hop

References

  • 2000Design and Analysis of Experiments2,656 cited
  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 2001Design and Analysis of Experiments, 5th Ed.1,475 cited
  • 2005Experimental investigation of heuristics for resource-constrained project scheduling: An update754 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 2014Introduction to quality engineering....641 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 2008Resource-constrained construction project scheduling model for profit maximization considering cash flow123 cited
  • 2008Resource‐Constrained Project Scheduling117 cited
  • 1980A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning84 cited
  • 2001Integrated project scheduling and material planning with variable activity duration and rewards75 cited
  • 1984Constrained resource project scheduling subject to material constraints67 cited
  • 2013A bi-objective optimization approach for exclusive bus lane selection and scheduling design58 cited
  • 2013Integrated scheduling and batch ordering for construction project56 cited
  • 1987

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Optimal Project Scheduling with Materials Ordering
53 cited