Delay is one of the major problems in Nigeria construction industry. Delay lead to many negative effects such as disputes between clients and contractors, increased costs, loss of productivity and revenue, and termination of contract. The aim of the paper is to investigate the causes of delay in Nigeria construction industry. The survey method was adopted for this work through questionnaire; the questionnaire was distributed to contractors, clients and consultants etc in the construction industry in Nigeria. The data collected was analyzes in rating form to determine the most causes of delay in the construction projects. However the results obtained from ranking analysis shows that improper planning, lack of communication, design errors and shortage of supply are rank high on the causes of delays in Nigeria construction industry. The paper concluded that delays causes more harm than good in construction project, therefore action should be taking to avoid such delay in construction projects in order to improve the efficiency and effectiveness of the industry. Consequently it was recommended that adequate planning; coordination; and proper monitoring of the construction projects by an experience and qualify professionals should be encourage to reduce the impact of delays on construction projects.
Loading…
Stored only when both papers are in the corpus — 54 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.