SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project Planning under Uncertainty Using Scenario Analysis
7 references·1 citing·25 second hop
Project Planning under Uncertainty Using Scenario Analysis (2005)Project Planning under Uncertainty Using …Journal of Industrial Engineering (2017)Journal of Industrial Enginee…A guide to the project management body of knowledge (PMBOK guide) (2004)A guide to the project manage…Simulation with Visual SLAM and AweSim (1997)Simulation with Visual SLAM a…Stochastic Project Networks (1990)Stochastic Project NetworksA management guide to PERT/CPM: With GERT/PDM/DCPM and other networks (1977)A management guide to PERT/CP…GERT - Graphical Evaluation and Review Technique (1966)GERT - Graphical Evaluation a…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…Time Management of Infrastructure Recovery Schedules by Anticipation and Valuation of Disruptions (2018)Time Management of Infrastruc…Multiple Criteria Decision Analysis (2002)Understanding interobserver agreement: the kappa statistic. (2005)An EOQ Model for Items with Weibull Distribution Deterioration (1973)Marketing's Interaction with Other Functional Units: A Conceptual Framework and Empirical Evidence (1987)Revised NIOSH equation for the design and evaluation of manual lifting tasks (1993)A comparison of forecasting methods for hotel revenue management (2003)Evaluation of forecasting error measurements and techniques for intermittent demand (2010)Examination of demand forecasting by time series analysis for auto parts remanufacturing (2015)Distribution of the Time Through a Directed, Acyclic Network (1965)Managing project uncertainty: from variation to chaos (2002)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A Survey of Activity Network‐Based Process Models for Managing Product Development Projects (2007)Modeling impacts of process architecture on cost and schedule risk in product development (2002)Robust and reactive project scheduling: a review and classification of procedures (2004)The evolution of the intellectual structure of operations management—1980–2006: A citation/co‐citation analysis (2008)Simplified Discrete-Event Simulation Approach for Construction Simulation (2003)A Simulation-Based Process Model for Managing Complex Design Projects (2005)Critical-path planning and scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)A Retrospective look at our Evolving Understanding of Project Success (2005)Understanding the key risks in construction projects in China (2007)Exploring the value of project management: Linking Project Management Performance and Project Success (2013)
this work references cited by second hop

References

  • 2004A guide to the project management body of knowledge (PMBOK guide)4,323 cited
  • 2017Journal of Industrial Engineering1,639 cited
  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1997Simulation with Visual SLAM and AweSim305 cited
  • 1966GERT - Graphical Evaluation and Review Technique161 cited
  • 1977A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks116 cited
  • 1990Stochastic Project Networks60 cited

Cited by

  • 2018Time Management of Infrastructure Recovery Schedules by Anticipation and Valuation of Disruptions24 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work