MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm
15 references·4 citing·42 second hop
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm (2016)MOSCOPEA: Multi-objective construction sc…Cash flow modeling for construction projects (2014)Cash flow modeling for constr…Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow (2010)Profit Optimization for Multi…Optimizing Resource Leveling in Construction Projects (2009)Optimizing Resource Leveling …Heuristic method for multi‐project finance‐based scheduling (2009)Heuristic method for multi‐pr…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Distributed Scheduling Model for Infrastructure Networks (2004)Distributed Scheduling Model …Genetic Optimization for Dynamic Project Control (2003)Genetic Optimization for Dyna…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling (2001)Analysis of Scheduling Scheme…Business failures in the construction industry (2000)Business failures in the cons…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Management of multiple simultaneous projects: a state-of-the-art review (1995)Management of multiple simult…Contractor Failure: Analysis (1991)Contractor Failure: AnalysisModified multi-objective evolutionary programming algorithm for solving project scheduling problems (2021)Modified multi-objective evol…Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Finance-based scheduling mult…Finance-based scheduling: optimization of results-based funded multiple projects (2019)Finance-based scheduling: opt…Time-cost tradeoff analysis with minimized project financing cost (2018)Time-cost tradeoff analysis w…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A market-based multi-agent system model for decentralized multi-project scheduling (2006)A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (2007)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm (2019)Business Failure in Construction Industry (1988)Decision Criteria in Contractor Prequalification (1988)Applying cluster analysis to construction contractor classification (1996)Artificial intelligence approaches to achieve strategic control over project cash flows (2008)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Project management — A managerial approach (1989)A fuzzy ANP-based approach to R&D project selection: A case study (2005)Project overload: An exploratory study of work and management in multi-project settings (2006)Multiple Team Membership: A Theoretical Model of its Effects on Productivity and Learning for Individuals and Teams. (2011)The discrete time-cost tradeoff problem revisited (1995)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)FINANCIAL RATIOS, DISCRIMINANT ANALYSIS AND THE PREDICTION OF CORPORATE BANKRUPTCY (1968)The Population Ecology of Organizations (1977)Structural Inertia and Organizational Change (1984)Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine (2006)Applying Z-score model to distinguish insolvent construction companies in China (2011)Factors affecting contractor's business failure: contractors' perspective (2012)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Work Continuity Constraints in Project Scheduling (2005)A genetic algorithm-based method for scheduling repetitive construction projects (2009)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Optimized acceleration of repetitive construction projects (2013)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1995Management of multiple simultaneous projects: a state-of-the-art review286 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 2000Business failures in the construction industry147 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 2001Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling144 cited
  • 2009Optimizing Resource Leveling in Construction Projects120 cited
  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 1991Contractor Failure: Analysis76 cited
  • 2003Genetic Optimization for Dynamic Project Control70 cited
  • 2009Heuristic method for multi‐project finance‐based scheduling68 cited
  • 2014Cash flow modeling for construction projects63 cited
  • 2004Distributed Scheduling Model for Infrastructure Networks63 cited
  • 2010Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

57 cited

Cited by

  • 2018Time-cost tradeoff analysis with minimized project financing cost49 cited
  • 2020Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms49 cited
  • 2021Modified multi-objective evolutionary programming algorithm for solving project scheduling problems41 cited
  • 2019Finance-based scheduling: optimization of results-based funded multiple projects1 cited