Lessons Learned from the Housing Reconstruction Following the Bam Earthquake in Iran
0 references·16 citing·49 second hopsampled
Lessons Learned from the Housing Reconstruction Following the Bam Earthquake in Iran (2007)Lessons Learned from the Housing Reconstr…Critical factors to succeed in post-earthquake housing reconstruction in Iran (2023)Critical factors to succeed i…Post-earthquake reconstruction: Managing debris and construction waste in Gorkha and Sindhupalchok Districts, Nepal (2021)Post-earthquake reconstructio…Community‐led reconstruction, social inclusion and participation in post‐earthquake Nepal (2020)Community‐led reconstruction,…Challenges in Post-Disaster Housing Reconstruction: Analysis of Urban vs. Rural Communities (2020)Challenges in Post-Disaster H…Multi-stakeholder collaboration in community post-disaster reconstruction: case study from the Longmen Shan Fault area in China (2017)Multi-stakeholder collaborati…Managing institutional fragmentation and time compression in post-disaster reconstruction – the case of Bam (2017)Managing institutional fragme…Conflicts between recovery objectives: The case of housing reconstruction after the 2003 earthquake in Bam, Iran (2017)Conflicts between recovery ob…Analysis of Measures for Managing Issues in Post-Disaster Housing Reconstruction (2017)Analysis of Measures for Mana…Resident participation in post-Lushan earthquake housing reconstruction: a multi-stage field research method-based inquiry (2016)Resident participation in pos…AN ANALYSIS OF ISSUES FOR THE MANAGEMENT OF POST-DISASTER HOUSING RECONSTRUCTION (2016)AN ANALYSIS OF ISSUES FOR THE…Advantages and limitations of community-based post-disaster housing reconstruction projects (2016)Advantages and limitations of…Multi-criteria decision-making method for assessing the sustainability of post-disaster temporary housing units technologies: A case study in Bam, 2003 (2015)Multi-criteria decision-makin…Comparative Study on the Key Issues of Postearthquake Recovery and Reconstruction Planning: Lessons from the United States, Japan, Iran, and China (2014)Comparative Study on the Key …THE ROLE OF LOW-COST HOUSING IN THE PATH FROM VULNERABILITY TO RESILIENCE (2013)THE ROLE OF LOW-COST HOUSING …Aid Accountability and Participatory Approaches in Post-Disaster Housing Reconstruction (2011)Aid Accountability and Partic…Community based post disaster housing reconstruction: Indonesian perspective (2010)Community based post disaster…A Ladder Of Citizen Participation (1969)A ladder of community participation for underdeveloped countries (1996)Truths and myths about community participation in post-disaster housing projects (2006)Rebuilding Housing after a Disaster: Factors for Failure (2012)Exploring Indian post-disaster temporary housing strategy through a comparative review (2019)At Risk: Natural Hazards, People's Vulnerability and Disasters (1994)At Risk: Natural Hazards, People's Vulnerability, and Disasters (2005)Social-Ecological Resilience to Coastal Disasters (2005)Impacts of temporary housing on housing reconstruction after the Bam earthquake (2013)Post-Disaster Business Recovery and Sustainable Development: A Study of 2008 Wenchuan Earthquake (2018)Building Structural Systems in Christchurch's Post‐Earthquake Reconstruction (2019)Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction (2008)The Meaning of ‘Build Back Better’: Evidence From Post‐Tsunami Aceh and Sri Lanka (2008)Safer Homes, Stronger Communities: A Handbook for Reconstructing after Natural Disasters (2010)Rehabilitating coastal agriculture and aquaculture after inundation events: Spatial analysis of livelihood recovery in post-tsunami Aceh, Indonesia (2017)Identifying major challenges in managing post-disaster reconstruction projects: A critical analysis (2024)How to make a decision: The analytic hierarchy process (1990)World Urbanization Prospects: The 1996 Revision (1998)Multicriteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas (2016)Stochastic optimization model for distribution and evacuation planning (A case study of Tehran earthquake) (2019)Uncertain multi-objective multi-commodity multi-period multi-vehicle location-allocation model for earthquake evacuation planning (2019)Urban Hazard Mitigation: Creating Resilient Cities (2003)Causes of delay in large construction projects (2006)Factors Influencing Post-disaster Reconstruction Project Management for Housing Provision in the Gaza Strip, Occupied Palestinian Territories (2017)“Build back better” approach to disaster recovery: Research trends since 2006 (2019)Exploratory analysis of barriers to effective post-disaster recovery (2020)Australian Journal of Emergency Management (2021)Case Study Research: Design and Methods (1984)Case study research: Design and methods (1986)Strategic management a stakeholder approach (2010)Critical Chinese government behavior for swift housing reconstruction programme - The case of Dujiangyan following Wenchuan Earthquake (2019)Why Do Communities Recover Differently after Socio-Natural Disasters? Pathways to Comprehensive Success of Recovery Projects Based on Bam’s (Iran) Neighborhoods’ Perspective (2022)Factors influencing resource availability for post-disaster housing reconstruction: the case of Gaza Strip-Palestine (2023)Recovery after Disaster: Achieving Sustainable Development, Mitigation and Equity (1993)Current State of Post-Disaster Reconstruction Projects: A Bibliometric Analysis (2021)Developing an integrated model for planning the delivery of construction materials to post-disaster reconstruction projects (2022)Methodological fit in management field research (2007)Geographic Information and Geo-visualisation in support of Disaster Resilience (2019)Breaking the Cycle of Marginalization: How to Involve Local Communities in Multi-stakeholder Initiatives? (2022)Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (1994)Research design: qualitative, quantitative, and mixed methods approaches (2003)The making of cities after disasters: Strategic planning and the Central Italy temporary housing process (2022)A Holistic Analysis on Risks of Post-Disaster Reconstruction Using RStudio Bibliometrix (2024)Participation: the New Tyranny? (2001)The Gendered Nature of Natural Disasters: The Impact of Catastrophic Events on the Gender Gap in Life Expectancy, 1981–2002 (2007)Sendai Framework for Disaster Risk Reduction 2015-2030 (2018)When Housing and Communities Were Delivered: A Case Study of Post-Wenchuan Earthquake Rural Reconstruction and Recovery (2021)Earthquake disaster-induced urban policies: paradoxes and challenges in Turkey (2024)Scoping review of the depth of participation and barriers to community participation in post-disaster housing reconstruction (2024)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

No references inside the corpus for this window.

Cited by

  • 2015Multi-criteria decision-making method for assessing the sustainability of post-disaster temporary housing units technologies: A case study in Bam, 2003157 cited
  • 2016AN ANALYSIS OF ISSUES FOR THE MANAGEMENT OF POST-DISASTER HOUSING RECONSTRUCTION53 cited
  • 2010Community based post disaster housing reconstruction: Indonesian perspective45 cited
  • 2014Comparative Study on the Key Issues of Postearthquake Recovery and Reconstruction Planning: Lessons from the United States, Japan, Iran, and China44 cited
  • 2011Aid Accountability and Participatory Approaches in Post-Disaster Housing Reconstruction44 cited
  • 2017Analysis of Measures for Managing Issues in Post-Disaster Housing Reconstruction36 cited
  • 2017Multi-stakeholder collaboration in community post-disaster reconstruction: case study from the Longmen Shan Fault area in China36 cited
  • 2017Conflicts between recovery objectives: The case of housing reconstruction after the 2003 earthquake in Bam, Iran32 cited
  • 2017Managing institutional fragmentation and time compression in post-disaster reconstruction – the case of Bam31 cited
  • 2020Community‐led reconstruction, social inclusion and participation in post‐earthquake Nepal31 cited
  • 2020Challenges in Post-Disaster Housing Reconstruction: Analysis of Urban vs. Rural Communities31 cited
  • 2016Advantages and limitations of community-based post-disaster housing reconstruction projects23 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2016Resident participation in post-Lushan earthquake housing reconstruction: a multi-stage field research method-based inquiry22 cited
  • 2021Post-earthquake reconstruction: Managing debris and construction waste in Gorkha and Sindhupalchok Districts, Nepal20 cited
  • 2023Critical factors to succeed in post-earthquake housing reconstruction in Iran20 cited
  • 2013THE ROLE OF LOW-COST HOUSING IN THE PATH FROM VULNERABILITY TO RESILIENCE17 cited