this work references cited by second hopReferences
- 2004A guide to the project management body of knowledge (PMBOK guide)4,323 cited
- 1995Project management : a systems approach to planning, scheduling, and controlling3,100 cited
- 1982Project management: A systems approach to planning, scheduling and controlling2,408 cited
- 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
- 1997PSPLIB - A project scheduling problem library1,309 cited
- 2005Experimental investigation of heuristics for resource-constrained project scheduling: An update754 cited
- 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
- 1998A competitive genetic algorithm for resource-constrained project scheduling569 cited
- 1999Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis526 cited
- 2000Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem503 cited
- 2002Modeling impacts of process architecture on cost and schedule risk in product development488 cited
- 2001An integrated survey of deterministic project scheduling482 cited
- 2003The resource allocation syndrome: the prime challenge of multi-project management?473 cited
- 2003Complex Concurrent Engineering and the Design Structure Matrix Method
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work