SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Data exploration on factors that influences construction cost and time performance on construction project sites
5 references·2 citing·30 second hop
Data exploration on factors that influences construction cost and time performance on construction project sites (2018)Data exploration on factors that influenc…Time‐cost model for building projects in Nigeria (2006)Time‐cost model for building …Forecast models for actual construction time and cost (2003)Forecast models for actual co…Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)Factors of Non-Excusable Dela…Comparing contributors to time and cost performance in building projects (1998)Comparing contributors to tim…An evaluation of construction time performance in the building industry (1996)An evaluation of construction…Imprecise earned duration model for time evaluation of construction projects with risk considerations (2020)Imprecise earned duration mod…Datasets on factors influencing the urban environmental quality of intra-urban motor parks across density areas of Lagos metropolis (2018)Datasets on factors influenci…Factor analysis and related techniques (1994)An Introduction to Building Procurement Systems (2003)Factors influencing the construction time of civil engineering projects in Malaysia (2006)An Introduction to Building Procurement Systems (2010)Factors causing cost variation for constructing wastewater projects in Egypt (2012)The impact of contractors' prequalification on construction project delivery in Nigeria (2012)Studying the client's role in construction management (1984)Causes of Delay in Large Building Construction Projects (1995)Developing a Fuzzy Risk Allocation Model for PPP Projects in China (2010)Understanding the risks in China's PPP projects: ranking of their probability and consequence (2011)Interweaving Trust and Communication with Project Performance (2013)CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE (2025)Causes of High Costs of Construction in Nigeria (1988)Total Quality Management: The Route to Improving Performance (1993)A system dynamics model for assessing the impacts of design errors in construction projects (2011)What impacts the performance of large-scale government projects? (2016)Aggregation of factors causing cost overruns and time delays in large public construction projects (2017)An investigation into construction time performance (1995)Rethinking construction cost overruns: cognition, learning and estimation (2014)Cost overruns of public sector construction projects: a developing country perspective (2019)Decision Criteria in Contractor Prequalification (1988)Important causes of delay in public utility projects in Saudi Arabia (1999)The impact of contractors' management capability on cost and time performance of construction projects in Nigeria (2009)Probability distribution fitting of schedule overruns in construction projects (2013)Analysis of the travels of public transport passengers (road) in Ikorodu, Lagos, Nigeria (2011)Factors influencing the quality of rail transport services in metropolitan Lagos (2011)Exploration of editorial board composition, Citescore and percentiles of Hindawi journals indexed in Scopus (2018)Fuzzy sets (1965)Fuzzy sets (1996)A ratio ranking method of triangular intuitionistic fuzzy numbers and its application to MADM problems (2010)
this work references cited by second hop

References

  • 1996An evaluation of construction time performance in the building industry205 cited
  • 1998Factors of Non-Excusable Delays That Influence Contractors' Performance170 cited
  • 2003Forecast models for actual construction time and cost146 cited
  • 2006Time‐cost model for building projects in Nigeria132 cited
  • 1998Comparing contributors to time and cost performance in building projects85 cited

Cited by

  • 2020Imprecise earned duration model for time evaluation of construction projects with risk considerations34 cited
  • 2018Datasets on factors influencing the urban environmental quality of intra-urban motor parks across density areas of Lagos metropolis6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work