SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Inaccuracies in Cost and Demand Forecasts
16 references·0 citing·41 second hop
Inaccuracies in Cost and Demand Forecasts (2018)Inaccuracies in Cost and Demand ForecastsModelling Transport (2011)Modelling TransportSurvival of the unfittest: why the worst infrastructure gets built--and what we can do about it (2009)Survival of the unfittest: wh…The Four-Step Model (2007)The Four-Step ModelThe Economics of Urban Transportation (2007)The Economics of Urban Transp…Evaluating Urban Transport Improvements: Cost–Benefit Analysis in the Presence of Agglomeration and Income Taxation (2007)Evaluating Urban Transport Im…RETRACTED: Inaccuracy in Traffic Forecasts (2005)RETRACTED: Inaccuracy in Traf…How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation (2005)How (In)accurate Are Demand F…What Causes Cost Overrun in Transport Infrastructure Projects? (2004)What Causes Cost Overrun in T…Cost overruns in road construction—what are their sizes and determinants? (2003)Cost overruns in road constru…Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Big decisions, big risks. Improving accountability in mega projects (2002)Big decisions, big risks. Imp…Foundations of Dynamic Traffic Assignment: The Past, the Present and the Future (2001)Foundations of Dynamic Traffi…A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning (1992)A Desire Named Streetcar Fant…Discrete Choice Analysis: Theory and Application to Travel Demand (1987)Discrete Choice Analysis: The…Extensional versus intuitive reasoning: The conjunction fallacy in probability judgment. (1983)Extensional versus intuitive …Transportation research (1975)Transportation researchStudies in the Economics of Transportation. (1956)Urban transportation networks: Equilibrium analysis with mathematical programming methods (1986)The Traffic Assignment Problem: Models and Methods (1994)Robust optimization for emergency logistics planning: Risk mitigation in humanitarian relief supply chains (2010)Line planning in public transportation: models and methods (2011)Robotic load balancing for mobility-on-demand systems (2012)A Theory of the Allocation of Time (1965)Conditional logit analysis of qualitative choice behavior (1972)Prospect theory: An analysis of decision under risk (1988)The Fundamental Law of Road Congestion: Evidence from US Cities (2011)Urban Growth and Transportation (2012)Transportation Costs and the Spatial Organization of Economic Activity (2015)Location and Land Use: Toward a General Theory of Land Rent (1964)Measuring Urban Form: Is Portland Winning the War on Sprawl? (2004)Short‐term traffic forecasting: Overview of objectives and methods (2004)Should Urban Transit Subsidies Be Reduced? (2009)Prospect Theory: An Analysis of Decision under Risk (1979)Heuristics and Biases: The Psychology of Intuitive Judgment (2004)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Should we build more large dams? The actual costs of hydropower megaproject development (2014)What you Should Know about Megaprojects and Why: An Overview (2014)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Megaprojects and Risk (2003)Policy And Planning For Large Infrastructure Projects : Problems, Causes, Cures (2005)An Inventory for Measuring Depression (1961)Self-efficacy: Toward a unifying theory of behavioral change. (1977)Time Discounting and Time Preference: A Critical Review (2002)A perspective on judgment and choice: Mapping bounded rationality. (2003)Dual-Processing Accounts of Reasoning, Judgment, and Social Cognition (2007)Timid Choices and Bold Forecasts: A Cognitive Perspective on Risk Taking (1993)The revenge of the places that don’t matter (and what to do about it) (2017)Lying: Moral Choice in Public and Private Life (1979)Rationality and Power: Democracy in Practice. (1999)How common and how large are cost overruns in transport infrastructure projects? (2003)Directions for future research in project management: The main findings of a UK government-funded research network (2006)The Voice of the Customer (1993)Discrete Choice Methods with Simulation (2001)How the built environment affects physical activity (2002)Traffic Flow Prediction for Road Transportation Networks With Limited Traffic Data (2014)Vehicle routing problems for city logistics (2015)The potential of mobility as a service bundles as a mobility management tool (2018)
this work references cited by second hop

References

  • 1987Discrete Choice Analysis: Theory and Application to Travel Demand5,673 cited
  • 1983Extensional versus intuitive reasoning: The conjunction fallacy in probability judgment.3,990 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,490 cited
  • 2011Modelling Transport1,409 cited
  • 2007The Economics of Urban Transportation1,060 cited
  • 1975Transportation research1,027 cited
  • 2001Foundations of Dynamic Traffic Assignment: The Past, the Present and the Future803 cited
  • 2005How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation731 cited
  • 2004What Causes Cost Overrun in Transport Infrastructure Projects?649 cited
  • 2009Survival of the unfittest: why the worst infrastructure gets built--and what we can do about it531 cited
  • 2007The Four-Step Model459 cited
  • 2003Cost overruns in road construction—what are their sizes and determinants?397 cited
  • 1992A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning333 cited
  • 2007Evaluating Urban Transport Improvements: Cost–Benefit Analysis in the Presence of Agglomeration and Income Taxation330 cited
  • 2002Big decisions, big risks. Improving accountability in mega projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

219 cited
  • 2005RETRACTED: Inaccuracy in Traffic Forecasts218 cited
  • Cited by

    No citing works inside the corpus for this window.