SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Tolerance limits for project control: An overview of different approaches
16 references·0 citing·33 second hop
Tolerance limits for project control: An overview of different approaches (2018)Tolerance limits for project control: An …Incorporation of activity sensitivity measures into buffer management to manage project schedule risk (2015)Incorporation of activity sen…Classification of articles and journals on project control and earned value management (2015)Classification of articles an…Construction and evaluation framework for a real-life project database (2014)Construction and evaluation f…Monitoring project duration and cost in a construction project by applying statistical quality control charts (2012)Monitoring project duration a…Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation (2011)Modeling activity times by th…On the dynamic use of project performance and schedule risk information during projecttracking (2010)On the dynamic use of project…Measuring Time: Improving Project Performance Using Earned Value Management (2009)Measuring Time: Improving Pro…Prediction of project outcome (2008)Prediction of project outcomeAn evaluation of the adequacy of project network generators with systematically sampled networks (2007)An evaluation of the adequacy…From Nobel Prize to Project Management: Getting Risks Right (2006)From Nobel Prize to Project M…A simulation and evaluation of earned value metrics to forecast the project duration (2006)A simulation and evaluation o…A comparison of different project duration forecasting methods using earned value metrics (2005)A comparison of different pro…Earned Value Project Management Method and Extensions (2003)Earned Value Project Manageme…Earned value in project management (2003)Earned value in project manag…Critical chain: the theory of constraints applied to project management (2000)Critical chain: the theory of…Intuitive prediction: Biases and corrective procedures (1982)Intuitive prediction: Biases …Evaluation of Models for Forecasting the Final Cost of a Project (2000)An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index (2010)A review of analytical models, approaches and decision support tools in project monitoring and control (2014)Six decades of project management research: Thematic trends and future opportunities (2016)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)Managing the Unknown (2006)EDM: Earned Duration Management, a new approach to schedule performance management and measurement (2013)Deciding to Act (2000)What is this thing called theory of constraints and how should it be implemented (1990)On the merits and pitfalls of critical chain scheduling (2001)And then came Complex Project Management (revised) (2008)Clarifying the project complexity construct: Past, present and future (2016)Prospect Theory: An Analysis of Decision under Risk (1979)Heuristics and Biases (2002)Megaprojects and Risk (2003)A Bayesian Approach to Improve Estimate at Completion in Earned Value Management (2012)Should we build more large dams? The actual costs of hydropower megaproject development (2014)What you Should Know about Megaprojects and Why: An Overview (2014)Project management: A systems approach to planning, scheduling and controlling (1982)Project management — A managerial approach (1989)A Guide to the project management body of knowledge (1996)Sustainable project management through project control in infrastructure projects (2017)Unrealistic optimism about future life events. (1980)Does the Stock Market Overreact? (1985)Returns to Buying Winners and Selling Losers: Implications for Stock Market Efficiency (1993)Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns (2005)THE HANDBOOK OF PROJECT-BASED MANAGEMENT (2008)Support Vector Machine Regression for project control forecasting (2014)A review of methods, techniques and tools for project planning and control (2018)
this work references cited by second hop

References

  • 1982Intuitive prediction: Biases and corrective procedures1,152 cited
  • 2006From Nobel Prize to Project Management: Getting Risks Right498 cited
  • 2003Earned value in project management418 cited
  • 2003Earned Value Project Management Method and Extensions414 cited
  • 2005A comparison of different project duration forecasting methods using earned value metrics360 cited
  • 2008Prediction of project outcome319 cited
  • 2000Critical chain: the theory of constraints applied to project management240 cited
  • 2007An evaluation of the adequacy of project network generators with systematically sampled networks202 cited
  • 2006A simulation and evaluation of earned value metrics to forecast the project duration171 cited
  • 2010On the dynamic use of project performance and schedule risk information during projecttracking137 cited
  • 2014Construction and evaluation framework for a real-life project database132 cited
  • 2015Classification of articles and journals on project control and earned value management115 cited
  • 2011Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation108 cited
  • 2012Monitoring project duration and cost in a construction project by applying statistical quality control charts107 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2015
Incorporation of activity sensitivity measures into buffer management to manage project schedule risk
102 cited
  • 2009Measuring Time: Improving Project Performance Using Earned Value Management90 cited
  • Cited by

    No citing works inside the corpus for this window.