this work references cited by second hopReferences
- 1993Decisions with Multiple Objectives4,434 cited
- 1983Skills, rules, and knowledge; signals, signs, and symbols, and other distinctions in human performance models3,432 cited
- 1983Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report1,460 cited
- 1943Defining the 'field at a given time.'1,018 cited
- 1994Human Reliability Analysis: Context and Control734 cited
- 1985Handbook of human reliability analysis with emphasis on nuclear power plant applications694 cited
- 2006Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents269 cited
- 1996The validation of three human reliability quantification techniques — THERP, HEART and JHEDI: Part 1 — technique descriptions and validation issues218 cited
- 1996A technique for human error analysis (ATHEANA)188 cited
- 2003A taxonomy of performance influencing factors for human reliability analysis of emergency tasks186 cited
- 1990Human reliability analysis: Need, status, trends and limitations183 cited
- 1976Outlines of a Hybrid Model of the Process Plant Operator168 cited
- 2007A simplified CREAM prospective quantification process and its application166 cited
- 2003Model-based human reliability analysis: prospects and requirements
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work