Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
11 references·16 citing·27 second hop
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)Time-Cost Trade-off Optimization of Const…Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Discrete particle swarm optim…A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)A novel multi criteria decisi…A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems (2013)A new multi-objective multi-m…A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A fuzzy clustering-based gene…A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A hybrid genetic algorithm fo…A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)A practical approach to proje…Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Fuzzy-multi-objective particl…Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Applying Pareto Ranking and N…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic Construction Time-…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Multi-objective optimization of responsible sourcing, consumption, and production in construction supply chains: an NSGA-III approach toward achieving SDG 12 (2025)Multi-objective optimization …Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach (2025)Integrating environmental sus…Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)Optimizing time, cost, enviro…Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-III model for enhanced multi-objective decision making (2024)Optimizing construction time,…NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects (2024)NSGA-III based optimization m…Development of time–cost trade-off optimization model for construction projects with MOPSO technique (2024)Development of time–cost trad…Development of resource-constrained time-cost trade-off optimization model for ventilation system retrofitting using NSGA-III (2024)Development of resource-const…Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model (2023)Solving large-scale discrete …Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms (2023)Multi-objective time–cost tra…Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects (2023)Modified dynamic opposite lea…Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects (2023)Discrete OBNSGA III method-ba…Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project (2022)Resource-constrained time–cos…Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Multiple Objective Social Gro…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)Optimization of environmental…Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Integrating Quality and Safet…The analytic hierarchy process : planning, priority setting, resource allocation (1980)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem (2016)APPLICATION OF MULTIPLE CRITERIA DECISION MAKING METHODS IN CONSTRUCTION: A SYSTEMATIC LITERATURE REVIEW (2021)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project management in construction (2007)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)Fuzzy sets (1965)Fuzzy sets (1996)Decision Making in a Fuzzy Environment (2007)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Multiobjective Decision Making: Theory and Methodology (1983)Project Scheduling: A Research Handbook (2002)A classification and review of approaches and methods for modeling uncertainty in projects (2019)A Guide to the project management body of knowledge (1996)Time–cost–quality trade-off analysis for planning construction projects (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Metaheuristics for project and construction management – A state-of-the-art review (2011)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Extensions of the resource-constrained project scheduling problem (2023)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 2014A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects221 cited
  • 2010Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction180 cited
  • 2012A hybrid genetic algorithm for the discrete time–cost trade-off problem168 cited
  • 2000Stochastic Construction Time-Cost Trade-Off Analysis158 cited
  • 2004Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization141 cited
  • 2013A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems138 cited
  • 2013A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project133 cited
  • 2016Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem122 cited
  • 2011A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem120 cited

Cited by

  • 2024Development of time–cost trade-off optimization model for construction projects with MOPSO technique82 cited
  • 2020Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

75 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2020Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach62 cited
  • 2024NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects58 cited
  • 2022Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project56 cited
  • 2023Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms54 cited
  • 2023Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects53 cited
  • 2023Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects52 cited
  • 2024Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-III model for enhanced multi-objective decision making47 cited
  • 2024Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach46 cited
  • 2023Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model45 cited
  • 2021Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects40 cited
  • 2025Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach39 cited
  • 2025Multi-objective optimization of responsible sourcing, consumption, and production in construction supply chains: an NSGA-III approach toward achieving SDG 1233 cited
  • 2024Development of resource-constrained time-cost trade-off optimization model for ventilation system retrofitting using NSGA-III32 cited