Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
16 references·0 citing·34 second hop
Optimizing time, cost and quality in multi-mode resource-constrained project scheduling (2019)Optimizing time, cost and quality in mult…A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)A novel multi criteria decisi…A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems (2013)A new multi-objective multi-m…A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A fuzzy clustering-based gene…A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)A practical approach to proje…Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Fuzzy-multi-objective particl…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…A genetic algorithm for the resource constrained multi-project scheduling problem (2007)A genetic algorithm for the r…Incorporating Quality Considerations Into Project Time/Cost Tradeoff Analysis and Decision Making (2006)Incorporating Quality Conside…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource leveling in construc…Time, cost and quality trade-off in project management: a case study (1999)Time, cost and quality trade-…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Project management with time, cost, and quality considerations (1996)Project management with time,…Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A review of methods and algorithms for optimizing construction scheduling (2013)The analytic hierarchy process : planning, priority setting, resource allocation (1980)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem (2016)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)A Network Flow Computation for Project Cost Curves (1961)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management Guide to PERT/CPM (1969)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Multiple Attribute Decision Making (1981)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach (2012)A state of the art review of intelligent scheduling (2018)Critical-path planning and scheduling (1959)Project management : a systems approach to planning, scheduling, and controlling (1995)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)
this work references cited by second hop

References

  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem901 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 2007A genetic algorithm for the resource constrained multi-project scheduling problem334 cited
  • 1996Project management with time, cost, and quality considerations274 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 2014A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects221 cited
  • 1999Time, cost and quality trade-off in project management: a case study186 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 2010Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction180 cited
  • 2000Resource leveling in construction by genetic algorithm-based optimization and its decision support system application160 cited
  • 2013A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems138 cited
  • 2013A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

133 cited
  • 2011A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem120 cited
  • 2006Incorporating Quality Considerations Into Project Time/Cost Tradeoff Analysis and Decision Making102 cited
  • Cited by

    No citing works inside the corpus for this window.