SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Multi-objective optimization for repetitive scheduling under uncertainty
16 references·0 citing·31 second hop
Multi-objective optimization for repetitive scheduling under uncertainty (2019)Multi-objective optimization for repetiti…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Optimal Planning and Scheduli…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimizing Resource Utilizati…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal mode…Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic Construction Time-…Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems (1999)Using Machine Learning and GA…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Using Improved Genetic Algori…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…Construction Planning for Linear Projects (1980)Construction Planning for Lin…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Construction Resource Scheduling with Genetic Algorithms (1996)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A review of methods and algorithms for optimizing construction scheduling (2013)Decision analysis and behavioral research (1986)Scheduling Projects with Repeating Activities (1998)Optimizing linear project scheduling with multi-skilled crews (2012)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Project management in construction (2007)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)RPM: Repetitive Project Modeling (1990)Resource-Activity Critical-Path Method for Construction Planning (2003)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Time–cost–quality trade-off analysis for planning construction projects (2019)Fuzzy sets (1965)Fuzzy sets (1996)Bid/no-bid decision-making – a fuzzy linguistic approach (2004)Overview of the Application of “Fuzzy Techniques” in Construction Management Research (2009)Six decades of project management research: Thematic trends and future opportunities (2016)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 1997Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization209 cited
  • 2001A GA-based fuzzy optimal model for construction time–cost trade-off182 cited
  • 2005Optimal Planning and Scheduling for Repetitive Construction Projects166 cited
  • 2001Optimizing Resource Utilization for Repetitive Construction Projects161 cited
  • 2000Stochastic Construction Time-Cost Trade-Off Analysis158 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

1999
Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems
112 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • Cited by

    No citing works inside the corpus for this window.