SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Factors affecting the accuracy of cost estimate during various design stages
16 references·0 citing·44 second hop
Factors affecting the accuracy of cost estimate during various design stages (2019)Factors affecting the accuracy of cost es…Factors affecting the accuracy of cost estimate: case of Jordan (2018)Factors affecting the accurac…Model for Systematic Innovation in Construction Companies (2014)Model for Systematic Innovati…Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip (2013)Factors Affecting the Accurac…An evaluation of risk factors impacting construction projects in Ghana (2012)An evaluation of risk factors…Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models (2011)Predicting construction cost …Improving Cost Estimates of Construction Projects Using Phased Cost Factors (2006)Improving Cost Estimates of C…Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Critical determinants of construction tendering costs: Quantity surveyors’ standpoint (2005)Critical determinants of cons…Towards a knowledge-based assessment of conceptual cost estimates (2004)Towards a knowledge-based ass…A neural network approach for early cost estimation of structural systems of buildings (2004)A neural network approach for…Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression (2003)Predicting Accuracy of Early …Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Code of Practice for Project Management for Construction and Development (2002)Code of Practice for Project …Predicting Accuracy of Early Cost Estimates Based on Estimate Quality (2001)Predicting Accuracy of Early …Analysis of factors influencing project cost estimating practice (2000)Analysis of factors influenci…A Guide to the project management body of knowledge (1996)A Guide to the project manage…Case Study Research: Design and Methods (1984)Case Study Research: Design and Methods (1991)The New production of knowledge: the dynamics of science and research in contemporary societies (1995)Evaluation of the excess revenue sharing ratio in PPP projects using principal–agent models (2015)Causes and Consequences of Occupational Fatigue (2016)Effects of contractual flexibility on conflict and project success in megaprojects (2017)The essentials of factor analysis (1970)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Critical Success Factors for Different Project Objectives (1999)FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review (2019)A novel construction cost prediction model using hybrid natural and light gradient boosting (2020)Cost estimation and prediction in construction projects: a systematic review on machine learning techniques (2020)A Decision-Theoretic Generalization of On-Line Learning and an Application to Boosting (1997)Project success and project team management: Evidence from capital projects in the process industries (2007)Success in IT projects: A matter of definition? (2008)Optimized artificial intelligence models for predicting project award price (2015)Comparison of Artificial Intelligence Techniques for Project Conceptual Cost Prediction: A Case Study and Comparative Analysis (2020)An Authoritative Study on the Near Future Effect of Artificial Intelligence on Project Management Knowledge Areas (2021)Understanding cost growth and performance shortfalls in pioneer process plants (1981)Application of Support Vector Machines in Assessing Conceptual Cost Estimates (2007)Understanding the Landscape of Overruns in Transport Infrastructure Projects (2014)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Factors considered in tendering decisions by top UK contractors (1993)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors causing cost variation for constructing wastewater projects in Egypt (2012)Cost Studies of Buildings (2013)Examining the role of value management in controlling cost overrun [application on residential construction projects in Egypt] (2019)Assessing effects of economic factors on construction cost estimation using deep neural networks (2021)How common and how large are cost overruns in transport infrastructure projects? (2003)Megaprojects and Risk (2003)Directions for future research in project management: The main findings of a UK government-funded research network (2006)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Large construction projects in developing countries: a case study from Vietnam (2004)Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective (2010)Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors (2012)Predicting Construction Cost Using Multiple Regression Techniques (2006)Predicting construction cost overruns using text mining, numerical data and ensemble classifiers (2014)The Logical Framework Method for Defining Project Success (1999)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)Leadership competency profiles of successful project managers (2009)
this work references cited by second hop

References

  • 1996A Guide to the project management body of knowledge4,339 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,446 cited
  • 2000Analysis of factors influencing project cost estimating practice609 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited
  • 2003Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression291 cited
  • 2004A neural network approach for early cost estimation of structural systems of buildings285 cited
  • 2014Model for Systematic Innovation in Construction Companies200 cited
  • 2011Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models180 cited
  • 2001Predicting Accuracy of Early Cost Estimates Based on Estimate Quality166 cited
  • 2005Critical determinants of construction tendering costs: Quantity surveyors’ standpoint149 cited
  • 2006Improving Cost Estimates of Construction Projects Using Phased Cost Factors95 cited
  • 2012An evaluation of risk factors impacting construction projects in Ghana92 cited
  • 2018Factors affecting the accuracy of cost estimate: case of Jordan78 cited
  • 2002Code of Practice for Project Management for Construction and Development55 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2004Towards a knowledge-based assessment of conceptual cost estimates40 cited
  • 2013Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip37 cited
  • Cited by

    No citing works inside the corpus for this window.