SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time
6 references·1 citing·29 second hop
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time (2019)Scenario-based stochastic linear programm…How yield process misspecification affects the solution of disassemble-to-order problems (2015)How yield process misspecific…Capacitated disassembly scheduling with random demand (2010)Capacitated disassembly sched…Heuristics for solving disassemble-to-order problems with stochastic yields (2005)Heuristics for solving disass…Disassembly to order system under uncertainty (2005)Disassembly to order system u…A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS (2002)A MULTI-CRITERIA DECISION MAK…Sampling for qualitative research (1996)Sampling for qualitative rese…New models and efficient methods for single-product disassembly lot-sizing problem with surplus inventory decisions (2020)New models and efficient meth…Fuzzy sets (1965)Fuzzy Set Theory and Its Applications (1993)Fuzzy sets (1996)Quality management in product recovery using the Internet of Things: An optimization approach (2013)Use of MCDM techniques in environmentally conscious manufacturing and product recovery: State of the art (2015)Trade-in-to-upgrade as a marketing strategy in disassembly-to-order systems at the edge of blockchain technology (2020)Green and competitive: ending the stalemate (1995)Strategic Issues in Product Recovery Management (1995)Cost Accounting: A Managerial Emphasis, (2010)A Hybrid Manufacturing/Remanufacturing System With Random Remanufacturing Yield and Market-Driven Product Acquisition (2012)A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system (2013)On the use of RFID in the management of reusable containers in closed-loop supply chains under stochastic container return quantities (2014)Management Goals and Accounting for Control. (1967)Issues in environmentally conscious manufacturing and product recovery: a survey (1999)Reverse logistics system planning for recycling electrical appliances and computers in Taiwan (2001)Heuristics for demand-driven disassembly planning (2005)Evaluation of Waste Electronic Product Trade-in Strategies in Predictive Twin Disassembly Systems in the Era of Blockchain (2020)Remanufacturing planning for the reverse Wagner/Whitin models (2000)Capacitated disassembly scheduling and pricing of returned products with price-dependent yield (2018)EOQ inventory models for disassembly systems with disposal and lost sales (2018)The Discovery of Grounded Theory: Strategies for Qualitative Research. (1968)‘Unsatisfactory Saturation’: a critical exploration of the notion of saturated sample sizes in qualitative research (2012)Characterising and justifying sample size sufficiency in interview-based studies: systematic analysis of qualitative health research over a 15-year period (2018)A Review of the Quality Indicators of Rigor in Qualitative Research (2020)Dynamic Version of the Economic Lot Size Model (1958)A design for EoL approach and metrics to favour closed-loop scenarios for products (2016)Lot Sizing with Random Yields: A Review (1995)Production planning and control for remanufacturing: industry practice and research needs (2000)Balancing priorities: Decision‐making in sustainable supply chain management (2010)
this work references cited by second hop

References

  • 1996Sampling for qualitative research4,289 cited
  • 2005Disassembly to order system under uncertainty123 cited
  • 2002A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS108 cited
  • 2005Heuristics for solving disassemble-to-order problems with stochastic yields100 cited
  • 2010Capacitated disassembly scheduling with random demand67 cited
  • 2015How yield process misspecification affects the solution of disassemble-to-order problems33 cited

Cited by

  • 2020New models and efficient methods for single-product disassembly lot-sizing problem with surplus inventory decisions22 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work