No open-access location is known for this record yet.
No open-access location is known for this record yet.
In the last few years, there has been a growing interest in the disassembly scheduling problem to fulfil the demands of individual disassembled parts over a given planning horizon. An analysis of the literature shows that the disassembly lead time is often considered deterministic. Indeed, in real-life systems, this parameter is rarely known and often has uncertain values that can be caused by the complexity of disassembly operation. In this study, a new scenario-based stochastic linear programming model is proposed to deal with a multi-period, single product type and two-level disassembly lot-sizing problem under lead time uncertainty. The demand for each component is known for each time period and the real disassembly lead time of end-of-life product is an independent random discrete variable with a known probability distribution. The proposed model is used to determine the optimal quantity for disassembled end-of-life products in order to minimize the setup cost for end-of-life product and the sum of average inventory holding and backlogging costs for each component, over the planning horizon and all scenarios.
Loading…
Stored only when both papers are in the corpus — 22 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.