Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects
16 references·2 citing·49 second hop
Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects (2020)Assessing the Impact of Cost Overrun Caus…Global Climate Risk Index, 2021 (2023)Global Climate Risk Index, 20…Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry (2019)Time and Cost Overrun in the …THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA (2019)THE COST PERFORMANCE AND CAUS…A knowledge-based expert system to assess power plant project cost overrun risks (2019)A knowledge-based expert syst…The determinants of cost deviations and overruns in transport projects, an endogenous models approach (2018)The determinants of cost devi…Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong (2018)Measurement and Dependence An…Impact of Design Risk on the Performance of Design-Build Projects (2017)Impact of Design Risk on the …Aggregation of factors causing cost overruns and time delays in large public construction projects (2017)Aggregation of factors causin…COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY (2016)COST OVERRUN IN CONSTRUCTION …Public–Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study (2011)Public–Private Partnership Ri…A novel two-phase group decision making approach for construction project selection in a fuzzy environment (2011)A novel two-phase group decis…Academics and Auditors (2009)Academics and AuditorsPredicting final cost for competitively bid construction projects using regression models (2003)Predicting final cost for com…Case study of government initiatives for PRC's BOT power plant project (2000)Case study of government init…Risk Assessment in Construction Schedules (1999)Risk Assessment in Constructi…Factors Affecting Contractors' Risk of Cost Overburden (1998)Factors Affecting Contractors…Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects (2022)Using principal component ana…Risk induced contingency cost modeling for power plant projects (2020)Risk induced contingency cost…Fuzzy Sets and Systems - Theory and Applications (1980)Multiple Attribute Decision Making: Methods and Applications (1981)The Analytic Hierarchy Process (1985)A new design of the elimination and choice translating reality method for multi-criteria group decision-making in an intuitionistic fuzzy environment (2012)Site selection in waste management by the VIKOR method using linguistic assessment (2014)VIKOR and its Applications (2014)Productivity improvement in construction (1988)Modelling and assessment of critical risks in BOT road projects (2006)A study of ontology-based risk management framework of construction projects through project life cycle (2009)Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines (2014)Does public capital crowd out private capital? (1989)Is public expenditure productive? (1989)The Aftermath of Financial Crises (2009)Critical success factors for public-private partnership in water supply projects (2016)Critical Risk Factors of Transnational Public–Private Partnership Projects: Literature Review (2017)Contemporary Review of Anti-Corruption Measures in Construction Project Management (2018)Privatization and public-private partnerships (2000)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Megaprojects and Risk (2003)Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders (2017)Off the rails: The cost performance of infrastructure rail projects (2017)The Difficulty of Assessing Uncertainty (includes associated papers 6422 and 6423 and 6424 and 6425 ) (1976)Multinational Financial Management. (1983)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Factors influencing contractor performance: an international investigation (2003)A knowledge-based risk mapping tool for cost estimation of international construction projects (2014)Causes of construction delay: traditional contracts (2002)Modelling global risk factors affecting construction cost performance (2003)Scoping studies: towards a methodological framework (2005)Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China (2018)Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK (2019)Review of construction journals on causes of project cost overruns (2020)Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria (1999)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Critical success factors of construction projects in Jordan: an empirical investigation (2022)Modeling Profitability-Influencing Risk Factors for Construction Projects: A System Dynamics Approach (2022)An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry (2024)Application of TOPSIS in evaluating initial training aircraft under a fuzzy environment (2006)An Analysis of Multi-Criteria Decision Making Methods (2013)Partial Least Squares (PLS) Structural Equation Modeling (SEM) for Building and Testing Behavioral Causal Theory: When to Choose It and How to Use It (2014)Risk Evaluation Model of Wind Energy Investment Projects Using Modified Fuzzy Group Decision-making and Monte Carlo Simulation (2020)Applications of Bayesian approaches in construction management research: a systematic review (2021)Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis (2023)Critical success factors for BOT electric power projects in China: Thermal power versus wind power (2009)Public–private partnerships as a governance response to sustainable urbanization: Lessons from China (2019)Analysis of energy related CO2 emissions in Pakistan (2019)Climate risk and corporate environmental performance: Empirical evidence from China (2021)Climate Risk, Corporate Social Responsibility, and Firm Performance (2022)
this work references cited by second hop

References

  • 2023Global Climate Risk Index, 2021457 cited
  • 1999Risk Assessment in Construction Schedules187 cited
  • 2011A novel two-phase group decision making approach for construction project selection in a fuzzy environment156 cited
  • 1998Factors Affecting Contractors' Risk of Cost Overburden150 cited
  • 2017Aggregation of factors causing cost overruns and time delays in large public construction projects142 cited
  • 2000Case study of government initiatives for PRC's BOT power plant project98 cited
  • 2019Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry93 cited
  • 2009Academics and Auditors91 cited
  • 2019A knowledge-based expert system to assess power plant project cost overrun risks84 cited
  • 2011Public–Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study81 cited
  • 2016COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY80 cited
  • 2018Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong75 cited
  • 2003Predicting final cost for competitively bid construction projects using regression models72 cited
  • 2017Impact of Design Risk on the Performance of Design-Build Projects72 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2018The determinants of cost deviations and overruns in transport projects, an endogenous models approach68 cited
  • 2019THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA61 cited
  • Cited by

    • 2020Risk induced contingency cost modeling for power plant projects33 cited
    • 2022Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects30 cited