SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Development of a scale for factors causing delays in infrastructure projects in India
16 references·0 citing·40 second hop
Development of a scale for factors causing delays in infrastructure projects in India (2020)Development of a scale for factors causin…Partial least squares structural equation modeling (PLS-SEM) (2014)Partial least squares structu…Analysing factors affecting delays in Indian construction projects (2011)Analysing factors affecting d…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Causes of delay in large construction projects (2006)Causes of delay in large cons…What Causes Cost Overrun in Transport Infrastructure Projects? (2004)What Causes Cost Overrun in T…How common and how large are cost overruns in transport infrastructure projects? (2003)How common and how large are …Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Causes of construction delay: traditional contracts (2002)Causes of construction delay:…Construction delay: a quantitative analysis (2000)Construction delay: a quantit…Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives (1999)Cutoff criteria for fit index…A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…Power analysis and determination of sample size for covariance structure modeling. (1996)Power analysis and determinat…Book Review: Marketing Research: An Applied Orientation (1994)Book Review: Marketing Resear…Alternative Ways of Assessing Model Fit (1992)Alternative Ways of Assessing…Assessing Construct Validity in Organizational Research (1991)Assessing Construct Validity …A Paradigm for Developing Better Measures of Marketing Constructs (1979)A Paradigm for Developing Bet…Evaluating Structural Equation Models with Unobservable Variables and Measurement Error (1981)PLS-SEM: Indeed a Silver Bullet (2011)A primer on partial least squares structural equation modeling (PLS-SEM) (2014)Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers (2014)When to use and how to report the results of PLS-SEM (2018)Partial Least Squares Structural Equation Modeling (PLS-SEM) Using R (2021)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Significance tests and goodness of fit in the analysis of covariance structures. (1980)Structural Equations with Latent Variables. (1991)Fit indices in covariance structure modeling: Sensitivity to underparameterized model misspecification. (1998)Evaluating the use of exploratory factor analysis in psychological research. (1999)Coefficient Alpha and the Internal Structure of Tests (1951)The critical incident technique. (1954)Handbook of Industrial and Organizational Psychology. (1977)The Effect of a Market Orientation on Business Profitability (1990)Measuring Service Quality: A Reexamination and Extension (1992)\nThe use of partial least squares path modeling in international marketing (2009)Asymptotically distribution‐free methods for the analysis of covariance structures (1984)Evaluation of goodness-of-fit indices for structural equation models. (1989)Structural Model Evaluation and Modification: An Interval Estimation Approach (1990)Evaluating Goodness-of-Fit Indexes for Testing Measurement Invariance (2002)Two new Later Stone Age sites from the Final Pleistocene in the Falémé Valley, eastern Senegal (2024)Mail and Telephone Surveys: The Total Design Method. (1979)Electronic word-of-mouth via consumer-opinion platforms: What motivates consumers to articulate themselves on the Internet? (2004)Common Method Variance in IS Research: A Comparison of Alternative Approaches and a Reanalysis of Past Research (2006)An assessment of the use of partial least squares structural equation modeling in marketing research (2011)Organization and environment (1967)A Review and Synthesis of the Measurement Invariance Literature: Suggestions, Practices, and Recommendations for Organizational Research (2000)Common method biases in behavioral research: A critical review of the literature and recommended remedies. (2003)Structural Equation Modelling: Guidelines for Determining Model Fit (2008)Comparative fit indexes in structural models. (1990)Sensitivity of Goodness of Fit Indexes to Lack of Measurement Invariance (2007)Research methods for business: A skill building approach (1993)Delays in construction projects: The case of Jordan (2007)Lying: Moral Choice in Public and Private Life (1979)Rationality and Power: Democracy in Practice. (1999)Megaprojects and Risk (2003)Directions for future research in project management: The main findings of a UK government-funded research network (2006)What you Should Know about Megaprojects and Why: An Overview (2014)
this work references cited by second hop

References

  • 1999Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives110,919 cited
  • 1992Alternative Ways of Assessing Model Fit27,293 cited
  • 1979A Paradigm for Developing Better Measures of Marketing Constructs16,591 cited
  • 2014Partial least squares structural equation modeling (PLS-SEM)13,038 cited
  • 1996Power analysis and determination of sample size for covariance structure modeling.10,552 cited
  • 1994Book Review: Marketing Research: An Applied Orientation7,087 cited
  • 1991Assessing Construct Validity in Organizational Research6,651 cited
  • 2006Causes of delay in large construction projects1,781 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,490 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,478 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects843 cited
  • 2002Causes of construction delay: traditional contracts833 cited
  • 2003How common and how large are cost overruns in transport infrastructure projects?803 cited
  • 2011Analysing factors affecting delays in Indian construction projects800 cited
  • 2004What Causes Cost Overrun in Transport Infrastructure Projects?

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

649 cited
  • 2000Construction delay: a quantitative analysis561 cited
  • Cited by

    No citing works inside the corpus for this window.