SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project scheduling and material ordering problem with storage space constraints
14 references·1 citing·42 second hop
Project scheduling and material ordering problem with storage space constraints (2021)Project scheduling and material ordering …A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran (2019)A mathematical model for proj…Integrated planning of project scheduling and material procurement considering the environmental impacts (2018)Integrated planning of projec…A hybrid project scheduling and material ordering problem: Modeling and solution algorithms (2017)A hybrid project scheduling a…Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies (2016)Multi-mode resource-constrain…A robust bi-objective model for concurrent planning of project scheduling and material procurement (2016)A robust bi-objective model f…Total Cost Control in Project Management via Satisficing (2013)Total Cost Control in Project…Integrated scheduling and batch ordering for construction project (2013)Integrated scheduling and bat…RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)RanGen: A Random Network Gene…Integrated project scheduling and material planning with variable activity duration and rewards (2001)Integrated project scheduling…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Optimal Project Scheduling with Materials Ordering (1987)Optimal Project Scheduling wi…Maximizing the net present value of a project subject to materials and capital constraints (1987)Maximizing the net present va…Constrained resource project scheduling subject to material constraints (1984)Constrained resource project …A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning (1980)A formal set of algorithms fo…An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms (2023)An Integrated Model for Multi…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The use of buffers in project management: The trade-off between stability and makespan (2004)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)An evaluation of the adequacy of project network generators with systematically sampled networks (2007)Management Guide to PERT/CPM (1969)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)The development of cash flow weight procedures for maximizing the net present value of a project (1996)Material Requirements Planning (1978)USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Economic Lot Size Model (2004)Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm (2021)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity Delay in Stochastic Project Networks (1997)Heuristic method for multi‐project finance‐based scheduling (2009)Risk, Ambiguity, and the Savage Axioms (1961)Optimization of conditional value-at-risk (2000)The Price of Robustness (2004)Incentive Contracts in Serial Stochastic Projects (2015)Risk, Process Maturity, and Project Performance: An Empirical Analysis of US Federal Government Technology Projects (2015)Encouraging Help Across Projects (2018)Quality Engineering Using Robust Design (1990)Quality Engineering Using Robust Design (1991)Integrated resource management for simultaneous project selection and scheduling (2017)A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects (2019)Multi-mode resource-constrained project scheduling with uncertain activity cost (2020)Robust Optimization of Large-Scale Systems (1995)Robust solutions of uncertain linear programs (1999)Modeling and analysis of cascading failures in projects: A complex network approach (2018)A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration (2019)Applications of the extent analysis method on fuzzy AHP (1996)Categorization of indicators for sustainable manufacturing (2012)Sustainable supplier selection and order lot-sizing: an integrated multi-objective decision-making process (2014)Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms (2019)Sustainable Supplier Selection and Order Allocation Under Risk and Inflation Condition (2019)A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting (2020)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)
this work references cited by second hop

References

  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2003RanGen: A Random Network Generator for Activity-on-the-Node Networks298 cited
  • 2019A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran88 cited
  • 1980A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning84 cited
  • 1987Maximizing the net present value of a project subject to materials and capital constraints78 cited
  • 2001Integrated project scheduling and material planning with variable activity duration and rewards75 cited
  • 2016A robust bi-objective model for concurrent planning of project scheduling and material procurement73 cited
  • 1984Constrained resource project scheduling subject to material constraints67 cited
  • 2013Total Cost Control in Project Management via Satisficing64 cited
  • 2016Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies57 cited
  • 2013Integrated scheduling and batch ordering for construction project56 cited
  • 1987Optimal Project Scheduling with Materials Ordering53 cited
  • 2018Integrated planning of project scheduling and material procurement considering the environmental impacts51 cited
  • 2017A hybrid project scheduling and material ordering problem: Modeling and solution algorithms

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

46 cited

Cited by

  • 2023An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms33 cited