Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach
16 references·1 citing·44 second hop
Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach (2021)Trading off Time–Cost–Quality in Construc…A novel hybrid MCDM model for machine tool selection using fuzzy DEMATEL, entropy weighting and later defuzzification VIKOR (2020)A novel hybrid MCDM model for…Sustainability driven multi-criteria project portfolio selection under uncertain decision-making environment (2019)Sustainability driven multi-c…COMPARISON OF THREE FUZZY MCDM METHODS FOR SOLVING THE SUPPLIER SELECTION PROBLEM (2019)COMPARISON OF THREE FUZZY MCD…Sustainable third-party reverse logistic provider selection with fuzzy SWARA and fuzzy MOORA in plastic industry (2017)Sustainable third-party rever…Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case study (2017)Hybrid SWARA-COPRAS method fo…Evaluating construction projects of hotels based on environmental sustainability with MCDM framework (2017)Evaluating construction proje…Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies (2014)Construction projects selecti…SELECTION OF RATIONAL DISPUTE RESOLUTION METHOD BY APPLYING NEW STEP‐WISE WEIGHT ASSESSMENT RATIO ANALYSIS (SWARA) (2010)SELECTION OF RATIONAL DISPUTE…Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Fuzzy-multi-objective particl…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Time, cost and quality trade-off in project management: a case study (1999)Time, cost and quality trade-…Project management with time, cost, and quality considerations (1996)Project management with time,…Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…A fuzzy extension of Saaty's priority theory (1983)A fuzzy extension of Saaty's …Multiple Attribute Decision Making (1981)Multiple Attribute Decision M…Fuzzy sets (1965)Fuzzy setsDecision Support System for Analyzing Key Performance Indicators in Construction Projects Management (2022)Decision Support System for A…A Network Flow Computation for Project Cost Curves (1961)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management Guide to PERT/CPM (1969)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)A procedure for multiple-aspect decision making using fuzzy sets (1977)Rating and ranking of multiple-aspect alternatives using fuzzy sets (1977)Fuzzy Sets and Systems - Theory and Applications (1980)Fuzzy hierarchical analysis (1985)Global supplier development considering risk factors using fuzzy extended AHP-based approach (2005)Project management — A managerial approach (1989)Applications of the extent analysis method on fuzzy AHP (1996)Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach (2014)A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications (2016)A review of fuzzy AHP methods for decision-making with subjective judgements (2020)A scaling method for priorities in hierarchical structures (1977)Multiple Attribute Decision Making: Methods and Applications (1981)Multiple criteria decision-making techniques and their applications – a review of the literature from 2000 to 2014 (2015)Fuzzy best-worst multi-criteria decision-making method and its applications (2017)E-Commerce Promotional Products Selection Using SWARA and TOPSIS (2024)Construction Resource Scheduling with Genetic Algorithms (1996)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)Critical-path planning and scheduling (1959)Project management : a systems approach to planning, scheduling, and controlling (1995)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)A framework for supply chain performance measurement (2003)Thinking, Fast and Slow (2011)Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria (2018)An extended FMEA approach based on the Z-MOORA and fuzzy BWM for prioritization of failures (2019)Application of MCDM Methods in Sustainability Engineering: A Literature Review 2008–2018 (2019)The Measurement of Productive Efficiency (1957)Decision making with dependence and feedback : the analytic network process (1996)Best-worst multi-criteria decision-making method (2014)Determination of Objective Weights Using a New Method Based on the Removal Effects of Criteria (MEREC) (2021)Sustainable cities and communities assessment using the DARIA-TOPSIS method (2022)The applications of MCDM methods in COVID-19 pandemic: A state of the art review (2022)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)GIS‐based multicriteria decision analysis: a survey of the literature (2006)A state-of the-art survey of TOPSIS applications (2012)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)
this work references cited by second hop

References

  • 1965Fuzzy sets68,735 cited
  • 1981Multiple Attribute Decision Making8,857 cited
  • 1983A fuzzy extension of Saaty's priority theory3,067 cited
  • 2010SELECTION OF RATIONAL DISPUTE RESOLUTION METHOD BY APPLYING NEW STEP‐WISE WEIGHT ASSESSMENT RATIO ANALYSIS (SWARA)1,589 cited
  • 2014Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies585 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction366 cited
  • 2017Sustainable third-party reverse logistic provider selection with fuzzy SWARA and fuzzy MOORA in plastic industry332 cited
  • 1996Project management with time, cost, and quality considerations274 cited
  • 2020A novel hybrid MCDM model for machine tool selection using fuzzy DEMATEL, entropy weighting and later defuzzification VIKOR229 cited
  • 1999Time, cost and quality trade-off in project management: a case study186 cited
  • 2010Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction180 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 2017Evaluating construction projects of hotels based on environmental sustainability with MCDM framework166 cited
  • 2019Sustainability driven multi-criteria project portfolio selection under uncertain decision-making environment

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

157 cited
  • 2019COMPARISON OF THREE FUZZY MCDM METHODS FOR SOLVING THE SUPPLIER SELECTION PROBLEM148 cited
  • 2017Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case study140 cited
  • Cited by

    • 2022Decision Support System for Analyzing Key Performance Indicators in Construction Projects Management24 cited