SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Contracting
0 references·16 citing·43 second hop
Construction Contracting (2018)Construction ContractingEnhancing the Knowledge of Construction Business Failure: A Social Network Analysis Approach (2020)Enhancing the Knowledge of Co…Constructability: Outline of Past, Present, and Future Research (2017)Constructability: Outline of …Significant Causes and Effects of Variation Orders in Construction Projects (2014)Significant Causes and Effect…Using Nash bargaining to design project management contracts under cost uncertainty (2013)Using Nash bargaining to desi…Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar (2013)Critical Factors Determining …Construction project change management in Singapore: Status, importance and impact (2012)Construction project change m…An Analysis of the Selection of Project Contractor in the Construction Management Process (2011)An Analysis of the Selection …Variations and Change Orders on Construction Projects (2010)Variations and Change Orders …CONSTRUCTION CONTRACTOR PREQUALIFICATION FROM POLISH CLIENTS’ PERSPECTIVE (2010)CONSTRUCTION CONTRACTOR PREQU…Incentives and award procedures: competitive tendering vs. negotiations in procurement (2006)Incentives and award procedur…Developers' Views of Potential Causes of Variation Orders for Institutional Buildings in Singapore (2006)Developers' Views of Potentia…Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia (2006)Contractors’ Views of the Pot…Bidding for Incomplete Contracts: An Empirical Analysis (2006)Bidding for Incomplete Contra…Causes of Discrepancies between Design and Construction (2004)Causes of Discrepancies betwe…Incentive/disincentive contracts and its effects on industrial projects (2002)Incentive/disincentive contra…Evaluating the general conditions of a construction contract (1994)Evaluating the general condit…Markets and Hierarchies (1975)The Economic Institutions of Capitalism (1986)A Theory of Incentives in Procurement and Regulation (1993)When the Highest Bidder Loses the Auction: Theory and Evidence from Public Procurement (2009)Renegotiation of public contracts: An empirical analysis (2015)Causes of Delay in Large Building Construction Projects (1995)Using systems dynamics to better understand change and rework in construction project management systems (2002)Measuring the Impact of Rework on Construction Cost Performance (2009)Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication (2017)Effects of contractual flexibility on conflict and project success in megaprojects (2017)Investigating design changes in Malaysian building projects (2017)Construction Project Administration (1978)Contracting for major projects: eight business levers for top management (2003)The performance measurement of construction projects managed by ISO-certified contractors in Malaysia (2010)Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor’s Perspective Based on FIDIC Contract Cases (2020)The Architect: Chapters in the History of the Profession (1977)CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP (2010)Management competencies, complexities and performance in engineering infrastructure projects of Pakistan (2019)Evaluation of Advanced Construction Technology with AHP Method (1992)Multiple Criteria Decision Making (1993)Project Procurement System Selection Model (2000)A multi-agent systems-based contractor pre-qualification model (2016)A deterministic contractor selection decision support system for competitive bidding (2017)Contractor selection for renovation of cultural heritage buildings by PROMETHEE method (2019)Critical Success Factors for Construction Projects (1992)Project Change Management System (2001)Building Design Management (2007)Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction (2018)Identifying supply chain vulnerabilities in industrialized construction: an overview (2020)Causes and effects of delays in Malaysian construction industry (2007)Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network (2019)Risk management framework for construction projects in developing countries (2004)Conducting research literature reviews: from the Internet to paper (2005)Understanding the key risks in construction projects in China (2007)Analyzing the Past to Prepare for the Future: Writing a Literature Review (2002)Social network analysis: a powerful strategy, also for the information sciences (2002)A unified approach to mapping and clustering of bibliometric networks (2010)Impact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator (2020)Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach (2021)Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction (2021)Beardwell, I (ed.) Len, H (ed.) & Claydon, T (ed.) 2004, Human Resource Management: A Contemporary Approach, fourth edition, Pearson Education Limited, Essex. (2006)Assessment framework for construction supply chain relationships: Development and evaluation (2010)How procurement options influence risk management in construction projects (2011)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2002Incentive/disincentive contracts and its effects on industrial projects124 cited
  • 2012Construction project change management in Singapore: Status, importance and impact116 cited
  • 1994Evaluating the general conditions of a construction contract109 cited
  • 2010Variations and Change Orders on Construction Projects99 cited
  • 2020Enhancing the Knowledge of Construction Business Failure: A Social Network Analysis Approach97 cited
  • 2004Causes of Discrepancies between Design and Construction91 cited
  • 2006Bidding for Incomplete Contracts: An Empirical Analysis82 cited
  • 2014Significant Causes and Effects of Variation Orders in Construction Projects75 cited
  • 2017Constructability: Outline of Past, Present, and Future Research67 cited
  • 2011An Analysis of the Selection of Project Contractor in the Construction Management Process66 cited
  • 2006Incentives and award procedures: competitive tendering vs. negotiations in procurement66 cited
  • 2010CONSTRUCTION CONTRACTOR PREQUALIFICATION FROM POLISH CLIENTS’ PERSPECTIVE64 cited
  • 2013Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar60 cited
  • 2006Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

52 cited
  • 2006Developers' Views of Potential Causes of Variation Orders for Institutional Buildings in Singapore48 cited
  • 2013Using Nash bargaining to design project management contracts under cost uncertainty44 cited