Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development
15 references·4 citing·30 second hop
Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development (2024)Optimizing trade-off between time, cost, …Time-cost trade-off optimization model for retrofitting planning projects using MOGA (2024)Time-cost trade-off optimizat…NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects (2024)NSGA-III based optimization m…Development of time–cost trade-off optimization model for construction projects with MOPSO technique (2024)Development of time–cost trad…Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects (2024)Development of discrete oppos…Construction time–cost–resources–quality trade-off optimization using NSGA-III (2023)Construction time–cost–resour…Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO (2021)Fuzzy-multi-mode Resource-con…Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III (2021)Development of Multi-Objectiv…AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects (2021)AHP and NSGA-II-Based Time–Co…Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Latin hypercube sampling-base…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A hybrid genetic algorithm fo…Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms (2011)Time, Cost, and Environmental…Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems (2010)Multi‐objective particle swar…MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM (2007)MULTI-OBJECTIVE OPTIMIZATION …Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…A user-centric machine learning framework for predicting multi-modal accessibility in transit-oriented development zones for sustainable urban construction in tier-2 Indian cities (2026)A user-centric machine learni…Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach (2025)Integrating environmental sus…Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)Optimizing time, cost, enviro…Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-III model for enhanced multi-objective decision making (2024)Optimizing construction time,…Project management with time, cost, and quality considerations (1996)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (2014)Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (2015)Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search (2017)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems (2013)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION (2012)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Time–cost–quality trade-off analysis for planning construction projects (2019)Uncertainty (1990)Planning and analysis of construction operations (1992)A Guide to the project management body of knowledge (1996)Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan (2013)A many-objective optimization model for construction scheduling (2019)Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)Activity networks: Project planning and control by network models (1977)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Fuzzy sets (1965)A guide to the project management body of knowledge (PMBOK guide) (2004)Critical-path planning and scheduling (1959)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2012A hybrid genetic algorithm for the discrete time–cost trade-off problem168 cited
  • 2007MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM113 cited
  • 2020Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects112 cited
  • 2011Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms96 cited
  • 2010Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems86 cited
  • 2024Development of time–cost trade-off optimization model for construction projects with MOPSO technique82 cited
  • 2023Construction time–cost–resources–quality trade-off optimization using NSGA-III70 cited
  • 2021Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO69 cited
  • 2021Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III59 cited
  • 2021AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects59 cited
  • 2024Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

59 cited
  • 2024Time-cost trade-off optimization model for retrofitting planning projects using MOGA58 cited
  • 2024NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects58 cited
  • Cited by

    • 2024Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-III model for enhanced multi-objective decision making47 cited
    • 2024Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach46 cited
    • 2025Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach39 cited
    • 2026A user-centric machine learning framework for predicting multi-modal accessibility in transit-oriented development zones for sustainable urban construction in tier-2 Indian cities4 cited