SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
MITIGATING CORRIDOR TRAVEL IMPACTS DURING RECONSTRUCTION: AN OVERVIEW OF LITERATURE, EXPERIENCES, AND CURRENT RESEARCH
2 references·1 citing·11 second hop
MITIGATING CORRIDOR TRAVEL IMPACTS DURING RECONSTRUCTION: AN OVERVIEW OF LITERATURE, EXPERIENCES, AND CURRENT RESEARCH (1987)MITIGATING CORRIDOR TRAVEL IMPACTS DURING…Validation and use of equilibrium network assignment for urban highway reconstruction planning (1986)Validation and use of equilib…RECONSTRUCTING MAJOR TRANSPORTATION FACILITIES: THE CASE OF BOSTON'S SOUTHEAST EXPRESSWAY (1985)RECONSTRUCTING MAJOR TRANSPOR…Optimal subwork zone length and project start time for short-term daytime work zones from the contractor’s perspective (2013)Optimal subwork zone length a…Link capacity functions: A review (1976)The Stability of a Dynamic Model of Traffic Assignment—An Application of a Method of Lyapunov (1984)Aggregation effects on the network design problem (1986)Urban transportation networks: Equilibrium analysis with mathematical programming methods (1986)Optimal Work Zone Lengths for Four-Lane Highways (2001)Freeway Work Zone Traffic Delay and Cost Optimization Model (2003)Work Zone Optimization for Multiple-Lane Highway Resurfacing Projects with Time Constraints and Alternate Route (2006)Network-Level Scheduling of Road Projects During the Construction Season Considering Network Connectivity (2019)Bi-level optimization of long-term highway work zone scheduling considering elastic demand (2021)Dealing with congestion from a regional perspective The case of Massachusetts (1990)Evaluating the Impact of the Sudden Collapse of Major Freeway Connectors on Rapid Transit and Adjacent Freeway Systems: San Francisco Bay Area Case Study (2017)
this work references cited by second hop

References

  • 1985RECONSTRUCTING MAJOR TRANSPORTATION FACILITIES: THE CASE OF BOSTON'S SOUTHEAST EXPRESSWAY15 cited
  • 1986Validation and use of equilibrium network assignment for urban highway reconstruction planning15 cited

Cited by

  • 2013Optimal subwork zone length and project start time for short-term daytime work zones from the contractor’s perspective10 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work