SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process
12 references·0 citing·40 second hop
Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process (2013)Strategic Approaches at the Corridor and …Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study (2009)Highway Project Level Life-Cy…Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects (2009)Estimating Work Zone Road Use…Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Optimizing Construction Time …Impact of Lane Closures on Roadway Capacity. Part C: Modeling Diversion Propensity at Work Zones (2008)Impact of Lane Closures on Ro…Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction (2007)Guidance for Cost Estimation …Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule (2005)Planning Urban Highway Recons…Transportation Performance Measures in Australia, Canada, Japan, and New Zealand (2004)Transportation Performance Me…Developing a computer-aided methodology for district road network planning and prioritization in Nepal (2003)Developing a computer-aided m…Innovative project delivery methods for infrastructure: an international perspective (2002)Innovative project delivery m…management information system (2000)management information systemA Tabu Search Based Approach for Work Zone Scheduling (2000)A Tabu Search Based Approach …Accelerating Major Freeway Reconstruction Projects: The Houston Experience (1998)Accelerating Major Freeway Re…Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Estimating Road User Costs Associated with Highway Construction Projects: Simplified Method (2000)Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca) (2018)PLANNING TECHNIQUES TO ESTIMATE SPEEDS AND SERVICE VOLUMES FOR PLANNING APPLICATIONS (1997)Review of Road User Costs and Methods (2013)Influence of Project Bundling on Maintenance of Traffic Costs across Highway Project Types (2019)Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments (2020)Annals of operations research (1989)Introduction to Stochastic Programming (1997)A comprehensive framework for project selection problem under uncertainty and real-world constraints (2011)Introduction to Stochastic Programming (2011)Life-cycle cost analysis system for pavement management at project level (2011)Putting sustainability theory into roadway design practice: Implementation of LCA and LCCA analysis for pavement type selection in real world decision making (2017)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Ant colony optimization for resource-constrained project scheduling (2002)Metaheuristics for project and construction management – A state-of-the-art review (2011)Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints (2013)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)A Model for Estimating Excess User Costs at Highway Work Zones (1999)A Linear Programming Model for the Single Destination System Optimum Dynamic Traffic Assignment Problem (2000)An algorithmic framework for the scheduling of construction projects based on ant colony optimization and expert knowledge (2014)Urban Road Network Maintenance Scheduling Using Ant Colony Optimization (2021)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Predicting Accuracy of Early Cost Estimates Based on Estimate Quality (2001)Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach (2008)Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project (2016)Prediction of Unit Price Bids of Resurfacing Highway Projects through Ensemble Machine Learning (2018)Facility-based planning methodology for rural roads using spatial techniques (2016)Covering-Based Rural Road Network Methodology for Hilly Regions of Developing Countries: Application in Nepal (2017)The influence of the physical environment on self-recovery after disasters in Nepal and the Philippines (2020)Defining information systems as work systems: implications for the IS field (2008)Progress in information technology and tourism management: 20 years on and 10 years after the Internet—The state of eTourism research (2008)State of the art literature review on performance measurement (2010)Integrated Quality Management for Urban Transport Systems (2010)A Framework for the Assessment and Policy Development of Water Transit Services in Dubai, UAE (2011)SUSTAINABILITY PERFORMANCE MEASURES FOR STATE DOTS AND OTHER TRANSPORTATION AGENCIES (2011)EARLY CONTRACTOR INVOLVEMENT: A NEW STRATEGY FOR 'BUYING THE BEST' IN INFRASTRUCTURE DEVELOPMENT IN THE NETHERLANDS (2008)Contracting in highway maintenance and rehabilitation: Are spatial effects important? (2010)Early contractor involvement in dutch infrastructure development: Initial experiences with parallel procedures for planning and procurement (2012)
this work references cited by second hop

References

  • 2000management information system893 cited
  • 2008Optimizing Construction Time and Cost Using Ant Colony Optimization Approach143 cited
  • 2009Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study104 cited
  • 2007Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction74 cited
  • 2002Innovative project delivery methods for infrastructure: an international perspective48 cited
  • 2009Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects23 cited
  • 2005Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule20 cited
  • 2003Developing a computer-aided methodology for district road network planning and prioritization in Nepal17 cited
  • 2000A Tabu Search Based Approach for Work Zone Scheduling17 cited
  • 2004Transportation Performance Measures in Australia, Canada, Japan, and New Zealand16 cited
  • 2008Impact of Lane Closures on Roadway Capacity. Part C: Modeling Diversion Propensity at Work Zones5 cited
  • 1998Accelerating Major Freeway Reconstruction Projects: The Houston Experience5 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work