MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS
0 references·5 citing·21 second hop
MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS (2002)MEGAPROJECTS NEED MORE STUDY UP FRONT TO …Impact of Rework on Building Project and Organisation Performance: A View of Construction Professionals in Nigeria (2018)Impact of Rework on Building …Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects (2016)Chaos Theory: Implications fo…Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study (2015)Evaluation of risk factors ca…The cause factors of large project's cost overrun: a survey in the southern part of Peninsular Malaysia (2014)The cause factors of large pr…Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine (2013)Contractors’ perception of ri…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)A guide to the project management body of knowledge (PMBOK guide) (2004)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Determining the Critical Success Factors for Highway Construction Projects in Pakistan (2018)Key driving factors of cost overrun in highway infrastructure projects in Nigeria: a context-based perspective (2021)Organization Theory and Design (1983)Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)The Service-dominant Logic of Marketing: Dialog, Debate, and Directions (2006)Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects (2019)Determining Sample Size for Research Activities (1970)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)The common causes of rework in construction contracts: a diagnostic approach (2021)A hybrid SEM-ANN model for predicting overall rework impact on the performance of bridge construction projects (2022)How common and how large are cost overruns in transport infrastructure projects? (2003)Spotlight on construction cost overrun research: superficial, replicative and stagnated. (2015)Collaborative Planning Index: A Novel Comprehensive Benchmark for Collaboration in Construction Projects (2021)Rationalizing Critical Cost Overrun Factors on Public Sector Housing Programmes (2022)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2014The cause factors of large project's cost overrun: a survey in the southern part of Peninsular Malaysia35 cited
  • 2015Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study33 cited
  • 2018Impact of Rework on Building Project and Organisation Performance: A View of Construction Professionals in Nigeria30 cited
  • 2013Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine29 cited
  • 2016Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects25 cited